A 49.5 MW onshore wind project under CDM methodology ACM0002 with VVB-confirmed additionality and a standard grid-emission-factor baseline. The project is structurally sound for a wind avoidance credit, but the extracted record contains no verified monitoring data, three inter-document contradictions (two of which are reconcilable), ten material findings at validation, and a low extraction confidence that limits assurance.
Red Flags
- Ten material findings were raised by DNV at validation (insufficient coordinates, missing grid-connection evidence, baseline-scenario justification gaps, depreciation-life inconsistency, etc.), all subsequently resolved but indicating a weak initial PDD.
- No verified emission-reduction figures are available in the extracted record; the only ERR numbers are ex-ante (PDD) and a per-period figure from the validation report, so actual delivery cannot be confirmed.
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and the structured data may be incomplete or inaccurate.
- Baseline method is characterised as 'project' in the validation report but 'jurisdictional' in the PDD; for ACM0002 the grid emission factor is a jurisdictional parameter, so the validation-report label is inconsistent with the methodology.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Negligible, physically justified for wind
Grid EF baseline, method label inconsistent across docs
Mentioned and benefit-sharing described, but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →