A 10 MWp solar PV project in Ningxia, China, validated under CDM with a jurisdictional baseline and VVB-confirmed investment additionality test. The core design is sound, but four material findings (technical specification mismatches, non-conservative grid emission factor, investment analysis errors) and eight required corrective actions indicate a PDD that needed substantial remediation before registration. Monitoring data, FNRB, and usage-rate parameters are absent from the extracted record, limiting the ability to verify actual performance against claims.
Red Flags
- Four material findings in the validation report, including a mismatch between PDD technical specifications (solar cells, inverter, transformer) and actual implementation, and incorrect VAT/income tax calculations in the investment analysis
- Eight corrective actions were required before registration, including correction of the baseline emissions formula and the grid emission factor value
- No monitoring period, FNRB method, or usage monitoring method is stated in the extracted record, making it impossible to verify actual generation against the claimed 12,156 tCO₂e figure
- One of the seven source documents is listed as 'unknown', reducing confidence in the completeness of the evidence base
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test confirmed by VVB
mixed evidence / unresolved risk
0% deemed negligible, appropriate for grid PV
Jurisdictional baseline, grid EF 0.9179 (2010)
Safeguards and benefit sharing mentioned; no FPIC or grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →