Huadian Ningxia Ningdong Phase VI Wind Farm Project
#567of 1935 in Renewable energy#269of 1084 in China#387of 1459 in CDM (UNFCCC)#437of 1287 in ACM0002
Audit Analysis
A standard CDM wind farm project using the well-established ACM0002 methodology with a jurisdictional grid baseline and VVB-confirmed combined additionality test. The main weakness is the absence of any monitoring report or verified emission reduction figures, leaving the 586,068 tCO₂e claim unconfirmed against actual performance. Initial documentation contained multiple errors (all corrected), and no buffer pool or permanence mechanism is documented, though reversal risk is inherently low for grid-displacement wind projects.
Red Flags
- No monitoring report or verified ERR figures available — the 586,068 tCO₂e claim rests solely on the ex-ante validation estimate with no post-implementation confirmation
- No buffer pool or permanence mechanism documented; while wind projects carry low physical reversal risk, the grid emission factor (0.89635, 2011) could decline as China's grid decarbonises, eroding the baseline
- Eight material findings and eight corrective actions were raised during validation, indicating significant initial documentation deficiencies (PLF typo, incorrect coordinates, missing stakeholder surveys, inconsistent loan data)
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
low physical risk for wind
0% with negligible justification, sector-standard
Jurisdictional grid EF, standard method
Mentioned but FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →