Huadian Ningxia Ningdong Yangjiayao Wind Farm Expansion Project
#1127of 1935 in Renewable energy#641of 1084 in China#865of 1459 in CDM (UNFCCC)#364of 806 in AMS-I.D
Audit Analysis
A CDM wind farm expansion project in China with a jurisdictional grid baseline and VVB-confirmed investment additionality, but hampered by six material findings at validation (including non-conservative rounding of the grid emission factor and missing DNA approvals) and a complete absence of monitoring-period data. The project is a straightforward renewable-energy displacement activity with low inherent reversal risk, but the documentation quality and transparency gaps limit confidence in the credit's robustness.
Red Flags
- Six material findings at validation, including non-conservative rounding of the grid emission factor (CAR-4) and incorrect sensitivity analysis calculations (CAR-6), indicating methodological sloppiness at the time of approval
- No monitoring-period data, verified emission reductions, or usage monitoring method found in any available document — the project's actual performance is unverifiable from the extracted record
- The PDD reports a total of 159,985 tCO₂e while the validation report confirms 22,855 tCO₂e; although this is consistent with a 7-year crediting period (22,855 × 7 = 159,985), the discrepancy in reporting basis between the two documents creates ambiguity for end-users
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, reasonable for wind
Jurisdictional grid EF (0.9179, 2010)
Safeguards mentioned, benefit sharing described, but no FPIC or grievance mechanism documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →