Huadian Sichuan E'gongbao Hydropower Project
#1322of 1935 in Renewable energy#806of 1084 in China#1051of 1459 in CDM (UNFCCC)#1026of 1287 in ACM0002
Audit Analysis
A CDM hydropower project in Sichuan, China, with VVB-confirmed additionality via an investment test, but the validation report raised four corrective action requests specifically targeting the quality of the investment-cost analysis and the transparency of the common-practice comparison. The absence of any verified emission-reduction figures, monitoring-period data, or post-validation reports leaves the actual delivery of the 482,122 tCO₂e claim unconfirmed, and a significant discrepancy in the grid emission factor between the validation report and an appendix undermines confidence in the baseline calculation.
Red Flags
- Grid emission factor discrepancy: the validation report (2012-09-11) uses 0.7707 tCO₂/MWh while an appendix document lists 1.087 tCO₂/MWh — a 41% difference that materially affects the claimed 482,122 tCO₂e
- Four corrective action requests in the validation report question the sufficiency of investment-cost inputs and the transparency of the common-practice project selection, yet no monitoring or verification reports were found to confirm these were resolved
- No verified emission-reduction figures, monitoring period, or verification reports exist in the extracted record, so the claimed ERR cannot be independently confirmed
- Low extraction confidence across the document set, with one document of unknown type, limits the reliability of the available evidence
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but CARs question cost inputs and common-practice transparency
Avoidance project (grid displacement); no reversal risk identified
0% deduction, reasonable for grid-connected hydro
Project-specific baseline; no reassessment date recorded
Safeguards mentioned; no FPIC or grievance mechanism documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →