Huadian Sichuan Mulihe Lizhou Hydropower Project
#1386of 1935 in Renewable energy#847of 1084 in China#1121of 1459 in CDM (UNFCCC)#1068of 1287 in ACM0002
Audit Analysis
A CDM hydropower project in Sichuan, China, with a VVB-confirmed combined additionality test and a jurisdictional baseline, but significant data gaps including no monitoring reports, no verified ERR, no buffer pool, and a seven-fold discrepancy between the PDD and validation report on total emissions reductions. The project's core design is sound for a grid-displacement hydro scheme, but the absence of post-validation data and the ERR contradiction materially limit confidence in the credit claims.
Red Flags
- Total ERR differs by a factor of ~7 between the PDD (8,273,916 tCO2e) and the validation report (1,181,988 tCO2e); no monitoring report is available to reconcile the figures
- Baseline method is described as 'jurisdictional' in the validation report but 'project' in the PDD, creating ambiguity about the actual baseline construction
- No monitoring reports, verification reports, or verified ERR figures are present in the extracted record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
no reversal data
0% deemed negligible, not quantified
Jurisdictional per VVB; PDD contradiction
Mentioned; no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →