Huizhou Landfill Gas Power Generation Phase III and IV Project

VCS-3348 ↗

#88of 189 in Methane#769of 1084 in China#857of 1339 in Verra (VCS)#81of 159 in ACM0001

4.8/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.0

Audit Analysis

A registered VCS landfill gas project with a reputable VVB and a closed corrective action, but undermined by significant contradictions across documents on additionality (legal capture requirement), leakage treatment, and FPIC status. The verified emissions reductions for the two-year monitoring period are roughly 112% of the pro-rata lifetime expectation, which is reasonable, yet the baseline and additionality foundations carry unresolved questions that limit confidence in the integrity of the claims.

Red Flags

  • The PDD states that LFG capture is legally required under GB 50869-2013, while the monitoring report states it is not — a fundamental additionality contradiction that the VVB addressed via a closed CAR but which remains unresolved in the document record.
  • Leakage deduction is 0% with the justification recorded as 'not addressed' in the verification report, despite the monitoring report claiming it was 'deemed negligible' — no substantive leakage analysis is documented.
  • Reversal events are recorded as 'not addressed' and no buffer pool percentage is stated, leaving permanence risk unquantified.
  • Two different grid emission factors (0.8042 and 0.50885) appear in monitoring reports dated 2023-06-30 and 2023-07-26, a 58% discrepancy that affects the magnitude of claimed reductions.
  • FPIC status is contradictory: the validation report records it as conducted, while the more recent monitoring report records it as not conducted.

Credit Vintages

IssuedRetiredAvailable
2020
5,5235,5221
2021
323,05675,255247,801
2022
251,60146,201205,400
Total580,180126,978453,202

Risk Indicators

Additionality

VVB-confirmed investment test, but PDD asserts legal capture requirement (GB 50869-2013) and CDM-3201 overlap unresolved in record

Permanence

Reversal events not addressed; LFG avoidance project has lower inherent risk

Leakage

0% deduction with justification recorded as 'not addressed' in verification report; monitoring report claims 'deemed negligible' but no analysis documented

Baseline

Project-specific baseline; measured per monitoring report but modeled per PDD; last reassessment date not stated (not yet due under 10-year VCS ALM rule)

Safeguards

Grievance mechanism present and safeguards mentioned, but FPIC status is contradictory across documents (conducted vs not conducted)

Double-claim

CORSIA eligibility and CCP status not stated; CDM-3201 overlap flagged in corrective actions but no explicit dual-registration evidence

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents