Ia Bang 1 Wind Power
GS-3226 ↗ · current registry ID: GS11237
#971of 1935 in Renewable energy#48of 80 in Vietnam#612of 1801 in Gold Standard (GS)#764of 1287 in ACM0002
Audit Analysis
The Ia Bang 1 Wind Power project is a grid-connected wind facility in Vietnam with VVB-confirmed additionality and no reversal risk, but it is undermined by a 0% leakage deduction with no documented justification, a project-specific baseline, 16 material findings (including actual emissions 26.5% below estimate), 12 outstanding corrective actions, and low extraction confidence across the document set. Pro-rata delivery sits at roughly 98% of the lifetime ex-ante expectation for the elapsed monitoring window, which is acceptable, yet the volume of data-quality issues and the absence of FPIC temper confidence in the overall claim.
Red Flags
- Leakage deduction of 0% with justification recorded as 'not addressed' in the most recent verification report (Jan 2026), contradicting an earlier report that described it as 'quantified'
- Material finding: actual emission reductions were 26.5% lower than estimated, signalling potential over-crediting in the ex-ante model
- 12 corrective actions remain open, including rectification of inconsistent crediting-period dates, PDD typographical errors (33 kV vs 22 kV bus bar), and a discrepancy in exchange rate and IRR calculations
- Free, Prior and Informed Consent (FPIC) was not conducted, despite the project's presence in a rural Vietnamese community
- Low extraction confidence across the document set, meaning at least one key document was poorly readable and some facts may be incomplete
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 23,003 | 0 | 23,003 | |
| 2022 | 110,494 | 0 | 110,494 | |
| 2023 | 117,519 | 8,000 | 109,519 | |
| 2024 | 123,713 | 0 | 123,713 | |
| 2025 | 47,379 | 0 | 47,379 | |
| Total | 422,108 | 8,000 | 414,108 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, justification not addressed
Project-specific, no reassessment recorded
Grievance & benefit-sharing present, FPIC not conducted
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →