Vai al contenuto principale
VCS Energy demand Nepal Registry: Registered Documentazione completa General Methodology v2.0

Improved cook stove market development in rural Nepal

VCS-2357 ↗

4.7 / 10
Integrity
5.6
Transparency
4.3
Claim Safety
4.8
Documentation
3.2

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test in the verification record.

missing The verification report lists multiple corrective actions, including concerns about baseline selection, sampling design, and transparency of efficiency loss application.

Transparency

verified The monitoring period and verified emissions are stated in the available verification record, and the project is on the VCS registry.

missing Key transparency elements are missing or unclear, including baseline reassessment timing, leakage deduction, and buffer pool treatment, while extraction confidence is low.

Claim Safety

verified The project is not CORSIA-eligible, which reduces one channel of double-claim risk.

missing The project uses a project baseline and has unresolved documentation issues, including a large discrepancy in verified emission reductions across documents.

Documentation

verified A relatively large set of documents was used, and the record includes a recent verification date in 2023.

missing Extraction confidence is low, and the evidence record contains several unresolved corrective actions plus contradictions across documents.

Detailed Analysis

Integrity

The verification record confirms additionality through an investment test and says the VVB accepted the project, which supports the integrity score. However, the same record lists several corrective actions, including concerns about baseline selection, sampling design, and transparency around efficiency loss application, which weakens confidence in the robustness of the crediting approach. Leakage is described as quantified, but the actual deduction is not stated in the extracted record, and buffer pool treatment is also not found.

Transparency

The project has a named VVB and a defined monitoring period, and the registry status is available, which helps transparency. Still, important details are missing, including baseline reassessment timing, buffer pool percentage, and the leakage deduction amount, and the extraction confidence is low. The corrective actions also indicate that monitoring parameter disclosure was incomplete in the verification materials.

Claim Safety

Claim safety is reduced by the use of a project baseline rather than a clearly standardized or recently reassessed baseline, and by the absence of a stated leakage deduction. The project is not CORSIA-eligible, which lowers dual-market risk, but the large discrepancy in verified emission reductions between documents raises over-crediting and reporting reliability concerns. The FNRB value is present, but the contradiction shows it was reported differently across documents, so I privileged the later verification record because it is more recent.

Documentation

Documentation quality is only moderate because 22 documents were used and the record includes a recent verification date, but the extraction confidence is low. Multiple corrective actions show that the verification package lacked clarity on sampling, baseline selection, and monitoring parameters. I also privileged the later 2023 values for safeguards, FNRB, and verified emissions over earlier conflicting figures because they are more recent and appear to come from the later verification cycle.

Overall

Overall, the project looks better than average on additionality but weaker on documentation reliability and claim safety. The main contradiction is the verified emissions figure: the later 2023 verification record reports 26,404, while an earlier record reports 46,931; I privileged the later value because it is more recent and tied to the latest verification cycle. I also privileged the later records for FPIC, safeguards, benefit sharing, grievance mechanism, and FNRB because they are more recent, but the presence of these contradictions and the low extraction confidence justify a downward adjustment to the scores.

Audit Analysis

The project has some positive integrity signals, including VVB-confirmed additionality and a quantified leakage treatment, but the evidence base is weakened by multiple corrective actions and low extraction confidence. Transparency and documentation are limited by missing baseline reassessment details, missing leakage and buffer information, and several document inconsistencies, including a major discrepancy in verified emission reductions.

Project Description

Proponent: Practical Action Protocol categories: Energy demand Protocols: AMS-II.G. Estimated annual GHG reductions: 44763 tCO2e Region: Asia Registration date: 2021-11-23

Red Flags

  • Verified emission reductions differ sharply across documents, with 26,404 claimed in the later verification record versus 46,931 in an earlier record.
  • Several corrective actions point to weak sampling transparency, missing monitoring parameter detail, and unclear baseline selection.

Credit Vintages

Issued Retired Available
2019
27,480 11,353 16,127
2020
24,329 2,051 22,278
2021
28,078 0 28,078
2022
21,991 0 21,991
Total 101,878 13,404 88,474

Cosa migliorerebbe questo punteggio

  • Publish the full leakage calculation, buffer pool treatment, and baseline reassessment history in the verification package.
  • Resolve the emission reduction discrepancy and provide a clearer, district-level sampling justification with complete monitoring parameter disclosure.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversal evidence, but buffer treatment not stated

Leakage

Leakage quantified, deduction not stated

Baseline

Project baseline with reassessment timing missing

Safeguards

FPIC, grievance, and benefit sharing documented

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti