Improved Cookstove Programme - Nigeria - VPA 48
GS-3327 ↗ · current registry ID: GS11306
#386of 1329 in Industrial#10of 79 in Nigeria#613of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard improved cookstove project in Nigeria with VVB-confirmed additionality and no reversal events, but undermined by a project-specific baseline, absence of a buffer pool, a 0% leakage deduction, and a large volume of material findings and corrective actions (29 combined) that signal ongoing documentation and parameter-stability issues. The VVB's verification of exactly the claimed 116,093 tCO₂e for the 2024 monitoring period is reassuring, yet the monitoring report's own figure of 302,731 and the permanent fNRB reduction from 0.91 to 0.38 raise questions about the robustness of the original ex-ante estimates.
Red Flags
- Monitoring report (Oct 2025) claims 302,731 tCO₂e while the VVB verification report (Jan 2026) verifies only 116,093 tCO₂e — a 62% reduction that is not fully explained in the extracted record.
- Permanent parameter changes approved mid-crediting-period (fNRB 0.91→0.38, charcoal-to-wood CF 6→4, baseline thermal efficiency 0.15→0.20) indicate the original PDD assumptions were materially inaccurate.
- 14 corrective actions remain open, including a Forward Action Request for physical inspection of Kaduna and Kano regions that has not yet been completed due to security concerns.
- Usage rate for Technology Strata 2, Age 1-2 is only 22.5% based on a limited sample, raising representativeness concerns for that cohort.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 1,107 | 0 | 1,107 | |
| 2022 | 53,022 | 0 | 53,022 | |
| 2023 | 151,285 | 0 | 151,285 | |
| 2024 | 116,093 | 0 | 116,093 | |
| Total | 321,507 | 0 | 321,507 |
Risk Indicators
VVB-confirmed investment test
no reversals
0% deemed negligible, no quantified analysis
Project-specific; no reassessment date
Grievance mechanism present; FPIC not conducted
CCP eligible; CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →