Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

Improved Cookstove Project In Uganda

GS-1606 ↗ · current registry ID: GS7438

#720of 1329 in Industrial#89of 163 in Uganda#1076of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.2
Transparency
5.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

The Improved Cookstove Project in Uganda is a Gold Standard energy-efficiency project with VVB-confirmed additionality and a conservative national-default FNRB, but it is undermined by a 0% leakage deduction with contradictory justifications, the absence of a buffer pool, 16 corrective actions raised during verification, and a single monitoring period delivering only ~56% of the pro-rata ex-ante expectation. The project's documentation, while spanning 11 sources, carries medium extraction confidence and one unidentified document, limiting full assurance.

Red Flags

  • Leakage deduction is 0% yet the verification report calls it 'quantified' while the monitoring report calls it 'deemed negligible'; the material findings further note that the substitution-within-households leakage assessment 'needed further demonstration' (verification report, 2023-03-31).
  • 16 corrective actions were required during verification, including missing ODA declaration, incomplete baseline survey description, inaccurate safeguarding justifications, and missing monitoring-device calibration data (verification report, 2023-03-31).
  • FPIC was not conducted (stated as false in the extracted record), despite the project operating in a community context in Uganda.
  • The single available monitoring period (2021) verified 95,762 tCO₂e against a pro-rata expectation of ~171,495 tCO₂e for one year of the five-year crediting period, representing only ~56% of the expected delivery.

Credit Vintages

IssuedRetiredAvailable
2019
32,68232,6820
2020
70,83070,098732
2021
95,76289,4116,351
Total199,274192,1917,083

Risk Indicators

Additionality

VVB-confirmed but test type not stated

Permanence

reversal risk unaddressed

Leakage

0% deduction with contradictory justification

Baseline

Project-specific; no reassessment date found

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents