InfraVest Taiwan Wind Farms Bundled Project 2011 - Taiwan

GS-2 ↗ · current registry ID: GS1001

#517of 1935 in Renewable energy#3of 6 in Taiwan#240of 1801 in Gold Standard (GS)#391of 1287 in ACM0002

5.8/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.5
Documentation
5.0

Audit Analysis

A Gold Standard wind energy avoidance project with a jurisdictional baseline and investment-test additionality, but hampered by nine corrective actions, five inter-document contradictions, and several unquantified parameters (FNRB, CORSIA/CCP status). The verified emissions reductions exceed the pro-rata ex-ante expectation, suggesting a conservative baseline, yet the monitoring record contains a date error and the grievance mechanism status is inconsistent across documents.

Red Flags

  • Nine corrective actions were required in the verification report, including incorrect meter calibration, missing meters (5 of 7 listed), and emissions factors not aligned with TPG data
  • Five contradictions between documents, including baseline method (jurisdictional vs project), ERR figures (108,960 vs 161,285), grievance mechanism (present vs absent), and crediting period dates
  • Monitoring period is recorded as '2021-11-01 — 2021-01-31', a date that starts after it ends, indicating a data-entry or extraction error
  • FNRB value and method are not stated in any available document, leaving a gap in the MRV chain
  • CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2014
115,336114,414922
2015
135,864134,4341,430
2016
143,982142,1611,821
2017
161,280137,59323,687
2018
149,810145,0154,795
2019
161,285141,28520,000
2020
108,960107,0811,879
Total976,517921,98354,534

Risk Indicators

Additionality

Investment test present; VVB confirmation not explicitly captured

Permanence

Avoidance project (wind); no storage or reversal risk

Leakage

0% deduction, justified as negligible for grid displacement

Baseline

Jurisdictional per 2021 VR; contradicted by 2015 VR; reassessment timing not stated

Safeguards

Grievance mechanism and benefit sharing mentioned; FPIC not stated; status contradicted in 2022 MR

Double-claim

CORSIA and CCP status both unstated; dual-channel risk unassessed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents