Installation of high efficiency wood burning cookstoves in Kenya 2
#57of 150 in Cookstoves#43of 157 in Kenya#602of 1339 in Verra (VCS)#5of 11 in VM0050
Audit Analysis
A VCS cookstove project in Kenya with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a three-fold FNRB discrepancy between the PDD and verification report, a significant ERR gap between the PDD lifetime estimate and verified figures, and eight corrective action requests plus eight clarification requests that signal material documentation and methodological gaps.
Red Flags
- FNRB value differs by a factor of three between the PDD (0.94, 2023) and the verification report (0.29, 2026), raising questions about which emission factor was actually applied in credit calculations
- The PDD states a total ERR of 200,744 while the verification report claims and verifies only 43,121 for the monitoring period, a gap that, even on a pro-rata basis, represents under-delivery of roughly 28% of the expected lifetime allocation
- Eight corrective action requests (CARs) and eight clarification requests (CLs) were raised in the verification report, covering PD discrepancies, missing stakeholder communication, boundary justification, KPT results, monitoring precision, and double-counting declarations
- Benefit-sharing is described in the 2023 validation report but the 2026 verification report states it is not described, creating an inconsistency in stakeholder engagement documentation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2025 | 5,138 | 0 | 5,138 | |
| Total | 5,138 | 0 | 5,138 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
5% quantified deduction
Project-specific, FNRB discrepancy
FPIC and grievance present, benefit-sharing inconsistent
CCP eligible, CORSIA not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →