Installation of Household biogas plants in India
GS-3458 ↗ · current registry ID: GS11437
#97of 268 in Biogas#576of 975 in India#853of 1801 in Gold Standard (GS)#30of 60 in AMS-I.E
Audit Analysis
A Gold Standard household biogas project in India with a verified combined additionality test and a quantified 5% leakage deduction, but undermined by a long trail of corrective actions across multiple verification reports covering ER calculation errors, sampling inconsistencies, and monitoring-period misstatements. The ex-ante lifetime figure contradicts itself within the same PDD (1,983,685 vs 183,675 tCO₂e), making pro-rata delivery assessment unreliable, and the functional-newness/baseline-replacement method shifted from local field measurement to a national default between the 2024 and 2025 verification reports without clear justification.
Red Flags
- The PDD contains two different lifetime ex-ante emission-reduction figures (1,983,685 and 183,675 tCO₂e) on the same document date, making it impossible to confirm whether the project is over- or under-delivering against its original estimate.
- The functional-newness / baseline-replacement method changed from a local field measurement (2024 verification report) to a national default (2025 verification report) while the numeric value stayed at 99 %, raising questions about which basis the credits were actually calculated on.
- Across at least four verification reports the VVB issued corrective actions for incorrect ER calculations, wrong monitoring-period dates, sampling-method inconsistencies, and ex-ante values that did not match the registered PDD, indicating a recurring MRV quality problem.
- The PDD states that Free, Prior and Informed Consent was conducted, but the stakeholder-consultation record for the same date (October 2020) records it as not conducted — a direct contradiction on a core safeguard.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Combined test, VVB-verified
Biogas – no carbon-stock reversal risk
5 % quantified deduction
Project-specific, no reassessment date
FPIC contradiction; grievance mechanism present
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →