Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalSouth Africa Registry: RegisteredACM0001

Interwaste Landfill gas Grouped Project

VCS-1794 ↗

#68of 189 in Methane#14of 59 in South Africa#718of 1339 in Verra (VCS)#64of 159 in ACM0001

5.0/ 10
Integrity
5.3
Transparency
4.5
Claim Safety
5.5
Documentation
4.0

Audit Analysis

The Interwaste Landfill Gas project in South Africa is a registered VCS project with VVB-confirmed additionality and no reversal events, but it is weighed down by a long history of recurring MRV deficiencies (delayed calibrations, default flare efficiencies, documentation inconsistencies) and a baseline characterization contradiction between its verification and monitoring reports. The absence of a buffer pool, a project-specific baseline, and a thin leakage justification limit confidence in the integrity of the credit claims.

Red Flags

  • Baseline characterization is contradictory: the 2019 verification report describes the baseline as 'measured' while the 2023 monitoring report describes it as 'modeled', raising data-reliability concerns about the baseline calculation.
  • Recurring material findings across multiple verification cycles (2019, 2023) for delayed calibration of flow meters and thermocouples, use of default 80% flare efficiency instead of bi-annual measurements, and late installation of the electricity meter indicate persistent MRV quality weaknesses.
  • Minimum extraction confidence is rated 'low', meaning at least one key document was poorly readable, reducing confidence in the completeness of the extracted record.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.

Credit Vintages

IssuedRetiredAvailable
2016
76,43876,4380
2018
49,56949,5690
2020
3,8213,8210
2021
9,1877,8981,289
2022
8,1098,1090
Total147,124145,8351,289

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, thin justification

Baseline

Project-specific, measured vs modeled contradiction

Safeguards

Grievance mechanism present, FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents