Skip to main content
CCLand use (AFOLU)BrazilGeneral Methodologyv2.1

Ipixuna REDD+ Project

ECO-125 ↗

#34of 99 in REDD+#56of 211 in Brazil#33of 99 in CerCarbono (CC)

5.3/ 10
Integrity
6.0
Transparency
4.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The Ipixuna REDD+ Project demonstrates solid core design features including VVB-verified additionality, a buffer pool, no reversal events, and documented FPIC and grievance mechanisms. However, seven material contradictions across key parameters (baseline method, buffer percentage, ex-ante lifetime ERR, and verified ERR figures) combined with low extraction confidence significantly undermine data reliability. The project appears to be delivering at or above pro-rata expectations, but the conflicting ex-ante estimates make it difficult to confirm the true over- or under-delivery ratio.

Red Flags

  • Seven contradictions across critical parameters (baseline method, buffer pool %, ex-ante lifetime ERR, verified ERR, claimed ERR, additionality test type, reversal events) indicate significant data reliability issues across the document set
  • Ex-ante lifetime ERR differs by 61% between the validation report (9.62M tCO2e) and the monitoring report (15.48M tCO2e), making the pro-rata delivery ratio uncertain (ranging from 98% to 158% of expectation)
  • Leakage is described as 'quantified' in the monitoring report but the actual deduction percentage is not stated in any available document
  • 25 corrective action requests were raised during verification, indicating material issues were identified and resolved, but the nature and severity of these findings is not detailed in the extracted record
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable, reducing confidence in the accuracy of all extracted figures

Credit Vintages

IssuedRetiredAvailable
2017
96096
2018
3830383
2019
5790579
2020
7730773
2021
9610961
2022
5570557
Total3,34903,349

Risk Indicators

Additionality

VVB-verified combined test

Permanence

Buffer pool present, no reversals

Leakage

Quantified but pct not stated

Baseline

Method contradictory across docs

Safeguards

FPIC, grievance, benefit sharing

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents