Skip to main content
CFCUrban Forest CarbonUnited StatesGeneral Methodologyv2.1

Issaquah Forest Carbon Offsets

CFC-issaquah-forest-carbon-offsets ↗

#150of 345 in United States#51of 59 in City Forest Credits (CFC)

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.0

Audit Analysis

The Issaquah urban forest preservation project has a VVB-confirmed additionality assessment and a 10% buffer pool, but is undermined by a reported windstorm reversal event affecting 5% of the project area, a missing quantitative leakage deduction, and the absence of FPIC, a grievance mechanism, and independently verified storage. The project-specific baseline and several unaddressed MRV elements (FNRB, usage monitoring) limit confidence in the credit claims.

Red Flags

  • Windstorm event (Nov 2024) caused tree failure on 5% of project area, losing stored carbon stock — a material reversal risk in a 40-year permanence claim
  • Leakage justification is labelled 'quantified' in the verification report but no deduction percentage is stated in any available document
  • No FPIC conducted and no grievance mechanism in place, despite the project affecting a public park area
  • Three contradictions across documents (benefit sharing, safeguards, reversal events) reduce confidence in the documentation record

Credit Vintages

IssuedRetiredAvailable
2021
6,4092,0334,376
Total6,4092,0334,376

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

Labelled quantified but no value stated

Baseline

Project-specific, no reassessment date

Safeguards

No FPIC, no grievance mechanism

Double-claim

Not CORSIA-eligible; CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents