Skip to main content
GSBiogas - ElectricityChinaACM0010

Ji’an Swine Farm Animal Manure Management System GHG Mitigation Project

GS-3227 ↗ · current registry ID: GS11238

#140of 268 in Biogas#771of 1084 in China#1081of 1801 in Gold Standard (GS)#44of 66 in ACM0010

4.8/ 10
Integrity
4.8
Transparency
5.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A Gold Standard biogas project on swine farms in China with VVB-confirmed additionality and no material findings, but undermined by an extensive list of 30+ corrective actions on the monitoring report, a project-specific modeled baseline, and unresolved contradictions on FPIC and additionality test type. The project delivered 183% of the pro-rata ex-ante expectation for the 5-month monitoring period, which is notable but may reflect a conservative lifetime estimate. Overall, the project is functional but carries moderate data-quality and documentation risks.

Red Flags

  • 30+ corrective actions on the monitoring report covering missing QA/QC procedures, meter installation gaps at 9 of the treatment plants, incomplete measurement methods, and a missing baseline scenario — indicating systemic MRV documentation weaknesses
  • Contradiction on FPIC: the validation report (Feb 2022) confirms FPIC was conducted, while the stakeholder consultation record (Oct 2020) indicates it was not — the earlier record may reflect a pre-validation gap, but the inconsistency is unresolved
  • No buffer pool percentage or permanence mechanism stated in the extracted record, leaving reversal risk for the biogas system unquantified
  • Additionality test type is inconsistent across documents: 'combined' in the monitoring report versus 'investment' in the financial document

Credit Vintages

IssuedRetiredAvailable
2020
79,42454,54424,880
2021
360,396340,86119,535
2022
208,146157,19750,949
Total647,966552,60295,364

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

Quantified but percentage not stated

Baseline

Project-specific, modeled, no reassessment date

Safeguards

Grievance mechanism present; FPIC status contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0010

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents