Jiangsu Qidong Yongyin Recycled PET Project
#401of 1084 in China#466of 1339 in Verra (VCS)#11of 72 in AMS-II.I
Audit Analysis
A VCS-registered PET recycling project in China with a VVB-verified investment additionality test, but the verification report flagged nine material findings including undemonstrated regulatory surplus and benchmark justification. The project delivered roughly 42% of the pro-rata ex-ante expectation for the elapsed monitoring period, and several key MRV parameters (FNRB, usage rates) are absent from the extracted record. Overall a mid-range project with moderate data gaps and under-delivery relative to its design estimate.
Red Flags
- Nine material findings in the verification report, including 'regulatory surplus not demonstrated' and 'benchmark value selected and type not demonstrated', which go to the core of the investment additionality test
- Verified ERR of 34,010 tCO₂e is only ~42% of the pro-rata expectation (~81,500) derived from the PDD lifetime estimate of 386,449 over the 1.48-year monitoring window of a 7-year crediting period
- Leakage deduction of 0% justified as 'deemed negligible' in the verification report, while the monitoring report characterises leakage as 'quantified' — an inconsistency in treatment
- Sixteen corrective actions were required, including revising the equation in section 5.2 of the joint PDMR and resubmitting the IRR calculation sheet
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified but with material findings on regulatory surplus and benchmark
Avoidance-type project; reversal stated as not applicable
0% deduction, 'deemed negligible'; inconsistent with monitoring report's 'quantified' characterisation
Project-specific baseline; reassessment timing not stated
Grievance mechanism and safeguards mentioned; FPIC not stated
CORSIA and CCP statuses not stated; dual-channel risk unassessed
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →