Jiaozhou Landfill Gas Recovery Project
#24of 189 in Methane#270of 1084 in China#307of 1339 in Verra (VCS)#21of 159 in ACM0001
Audit Analysis
The Jiaozhou Landfill Gas Recovery Project is a standard VCS LFG project (ACM0001 v19.0) verified by Applus+ Certification, with a confirmed investment additionality test and a reasonable 0% leakage deduction. However, the project delivered only about 40% of its pro-rata ex-ante expectation for the first monitoring period, the baseline methodology is inconsistent between the PDD (modelled) and the verification report (measured), and a direct contradiction exists on whether FPIC was conducted. Five cross-document contradictions and medium extraction confidence further temper confidence in the record.
Red Flags
- FPIC contradiction: the PDD (Oct 2022) states FPIC was conducted, but the monitoring report (Jan 2024) records it as not conducted — the more recent operational document is privileged, leaving a safeguards gap.
- Baseline methodology contradiction: the PDD describes a modelled baseline while the verification report describes a measured baseline; the VVB's assessment is privileged but the inconsistency undermines baseline confidence.
- Significant under-delivery: verified ERR of 56,640 tCO₂e for the ~2-year monitoring period is only ~40% of the pro-rata expectation (~140,914 tCO₂e) derived from the PDD lifetime estimate of 704,570 tCO₂e over the 10-year crediting period.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
LFG reversal risk low but unquantified
0% deduction, deemed negligible by VVB — reasonable for source capture
Project-specific; measured-vs-modelled contradiction across documents
Grievance mechanism present; FPIC status contradicted across documents
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →