Jinmu AWMS GHG Mitigation Project in Liaoning Province
#945of 1084 in China#1070of 1339 in Verra (VCS)#36of 43 in AMS-III.F
Audit Analysis
The Jinmu AWMS project is a registered VCS avoidance project (composting and methane recovery in manure management) with VVB-confirmed additionality, but it carries significant quality concerns: nine material findings, eight corrective actions, a 0% leakage deduction with inconsistent justification, and multiple contradictions across documents. The project delivered only about 62% of its pro-rata expectation for the first monitoring period, and key data points (buffer pool, CORSIA eligibility, usage monitoring) are absent from the record.
Red Flags
- Nine material findings in the verification report, including baseline emission calculation that did not consider regulatory methane capture requirements and unclear additionality barrier analysis
- Eight corrective actions required, including incomplete monitoring tables and inconsistent parameter lists between the joint PDD and verification report
- 0% leakage deduction with contradictory justifications ('quantified' in validation report vs 'deemed negligible' in PDD, both dated 2023-11-15)
- FPIC status contradicts between PDD versions (true in 2022, false in 2023); the more recent document indicates FPIC was not conducted
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 8,914 | 200 | 8,714 | |
| 2022 | 1,086 | 0 | 1,086 | |
| Total | 10,000 | 200 | 9,800 |
Risk Indicators
VVB-verified but barrier analysis questioned
Avoidance project, no reversal risk
0% deduction, contradictory justification
Project-specific, modeled, regulatory gap noted
Grievance mechanism present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →