Skip to main content
VCSWaste handling and disposalChina Registry: RegisteredAMS-III.D

Jiyuan Weiheng Cow Breeding Farm Biogas Recovery and Utilization Project

VCS-3830 ↗

#160of 268 in Biogas#851of 1084 in China#957of 1339 in Verra (VCS)#55of 105 in AMS-III.D

4.6/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A VCS-registered biogas project in China using the standardised AMS-III.D methodology, with a VVB-confirmed barrier additionality test and reasonable safeguards (FPIC, grievance mechanism). However, the project suffers from a significant transparency gap: no monitoring data, no verified ERR, and no buffer pool allocation are available in the extracted record. Two contradictions between the PDD and validation report (crediting period and leakage treatment) introduce data-reliability concerns that temper confidence in the claimed 262,451 tCO₂e lifetime figure.

Red Flags

  • Crediting period contradiction: the PDD (Oct 2022) states a 21-year period (Dec 2022 – Nov 2043) while the validation report (Mar 2023) records a 7-year period (Jun 2023 – Jun 2030); the validation report is privileged as the more recent and authoritative document, but the discrepancy is unexplained.
  • No monitoring or verification data available: total verified ERR, monitoring period, and usage monitoring method are all absent from the extracted record, making it impossible to validate the 262,451 tCO₂e lifetime claim.
  • Leakage justification inconsistent: the PDD (Oct 2022) does not address leakage, while the validation report (Mar 2023) records a 0% deduction deemed negligible; the validation report is privileged, but the gap in the PDD is a documentation weakness.
  • Low extraction confidence on at least one key document, reducing reliability of the structured data.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Barrier test VVB-confirmed, not legally required

Permanence

mixed evidence / unresolved risk

Leakage

0% deemed negligible; PDD does not address leakage

Baseline

Project-specific, modelled; no reassessment date

Safeguards

FPIC conducted, grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS-III.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents