VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalTurkey Registry: RegisteredACM0001

Kütahya Landfill Gas to Electricity Project

VCS-4206 ↗

#25of 189 in Methane#116of 295 in Turkey#309of 1339 in Verra (VCS)#22of 159 in ACM0001

5.7/ 10
Integrity
6.0
Transparency
5.5
Claim Safety
6.0
Documentation
5.0

Audit Analysis

The Kütahya Landfill Gas to Electricity Project is a well-established LFG-to-power credit type with VVB-confirmed additionality, no reversal events, and no material findings. However, six contradictions across the project documents — including a significant discrepancy between the PDD's claimed ERR (94,653 tCO₂e) and the monitoring report's figure (58,885 tCO₂e), conflicting statements on FPIC, leakage treatment, and baseline characterisation — materially reduce confidence in the data record. The project is fundamentally sound but the documentation inconsistencies warrant caution.

Red Flags

  • ERR contradiction: the PDD (Mar 2025) claims 94,653 tCO₂e while the monitoring report (Feb 2025) reports 58,885 tCO₂e for the same monitoring period; the verification report (Jun 2024) confirms 94,653, leaving the true verified figure ambiguous
  • FPIC status is contradictory: the validation report (Apr 2025) states FPIC was conducted, but the issuance document (Feb 2025) records it as not conducted
  • Leakage treatment is inconsistent: the monitoring report (Feb 2025) justifies a 0% deduction as 'deemed negligible', yet the validation report (Apr 2025) records leakage as 'not addressed'
  • CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2021
30,685030,685
2022
63,968063,968
Total94,653094,653

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification contradicted

Baseline

Project-specific, measured, minor contradiction

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA and CCP status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents