Audit Analysis
The Kanije Wind Farm is a straightforward renewable-energy avoidance project with a VVB-confirmed investment additionality test and a jurisdictional baseline, both of which are well-suited to the project type. However, six cross-document contradictions (notably a 2× discrepancy in the lifetime ex-ante ERR estimate) and a 0% buffer pool introduce moderate uncertainty. All 33 initial findings were resolved, and the verified ERR for the six-year monitoring period aligns closely with the pro-rata expectation derived from the validation report's lifetime figure.
Red Flags
- The lifetime ex-ante ERR is reported as 1,186,376 in the validation report but 639,522 in the monitoring report — a 2× discrepancy that, if the lower figure were correct, would imply the project delivered ~188% of the pro-rata expectation for the elapsed period.
- Buffer pool is set at 0% and the validation report marks reversal events as 'not addressed' (the PDD states 'none reported'), leaving a documentation gap on permanence risk even though the project is an avoidance type.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel or double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 106,587 | 0 | 106,587 | |
| 2017 | 106,587 | 0 | 106,587 | |
| 2018 | 106,587 | 0 | 106,587 | |
| 2019 | 106,587 | 0 | 106,587 | |
| 2020 | 106,587 | 0 | 106,587 | |
| 2021 | 106,587 | 0 | 106,587 | |
| 2022 | 120,506 | 0 | 120,506 | |
| 2023 | 142,116 | 0 | 142,116 | |
| 2024 | 142,116 | 0 | 142,116 | |
| 2025 | 142,116 | 0 | 142,116 | |
| Total | 1,186,376 | 0 | 1,186,376 |
Risk Indicators
VVB-confirmed investment test
reversal not fully addressed
Deemed negligible; reasonable for wind
Jurisdictional; reassessment date not stated
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →