Kantur-Akdaş Landfill Methane Recovery Project - 3
#520of 770 in Renewable energy#6of 14 in TR#9of 32 in Intl. Carbon Registry (ICR)#47of 53 in ACM0001
Audit Analysis
The Kantur-Akdaş Landfill Methane Recovery Project - 3 is a CDM-methodology landfill gas project registered in the ICR with a 10-year crediting period starting in 2017. The PDD describes a combined additionality test, quantified leakage, and no material findings, but the available record contains only the PDD — no verification report, monitoring report, or VVB identification — leaving critical compliance and performance questions unanswered.
Red Flags
- No verification report or monitoring report is present in the extracted record; the project has been in its crediting period since February 2017 yet no verified emission reduction figures or monitoring period data are available.
- No VVB (Validation/Verification Body) is named in the PDD, and additionality verification by an independent body is not confirmed.
- No buffer pool percentage is stated, leaving permanence risk unquantified for a project that has been operating since 2017.
- The FNRB (fossil net replacement benefit) value and usage rate are not stated, making it impossible to assess whether the claimed 123,211 tCO₂e lifetime figure is conservative.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Combined test in PDD, no VVB confirmation
Reversal N/A per PDD, no buffer pool stated
Quantified per PDD, specific % not stated
Project-specific, no reassessment date
Grievance & benefit sharing present, FPIC not stated
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →