Kardemir Bozyaka Wind Power Plant

GS-1536 ↗ · current registry ID: GS1306

#1181of 1935 in Renewable energy#222of 295 in Turkey#968of 1801 in Gold Standard (GS)#921of 1287 in ACM0002

4.9/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.8
Documentation
4.2

Audit Analysis

The Kardemir Bozyaka Wind Power Plant is a Gold Standard wind project with confirmed additionality and low permanence risk, but it is undermined by an extraordinary volume of data-quality errors, calculation inconsistencies, and document contradictions that required over 50 corrective actions. The project delivered roughly 60% of its pro-rata ex-ante expectation for the elapsed monitoring period, which is conservative, yet the project-specific baseline and unresolved ERR discrepancies between verification reports raise moderate over-crediting concerns.

Red Flags

  • Over 50 corrective actions and 19 material findings across verification and monitoring reports indicate systemic data-quality and documentation errors, including incorrect energy generation calculations, inconsistent ex-ante parameters, and misstated turbine capacities.
  • The ex-ante lifetime emission reduction estimate differs by roughly 24% between the PDD (244,520 tCO₂e) and the monitoring report (185,732 tCO₂e), and the verified ERR figure changed from 63,104 to 47,944 between two verification reports within the same year, raising questions about the stability of the credit quantity.
  • A deviation request was submitted but not approved because the stated reason was not force majeure, and the VVB flagged that the monitoring period duration exceeded the three-year limit from the site visit.

Credit Vintages

IssuedRetiredAvailable
2013
7,2663,0004,266
2014
17,0615,41611,645
2015
18,6857,97710,708
2016
23,13623,1360
2017
28,52328,5230
2018
10,77210,7720
2019
27,74727,7470
2020
18,06718,0670
Total151,257124,63826,619

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind avoidance – no reversal risk

Leakage

Quantified, 0% deduction appropriate for wind

Baseline

Project-specific baseline, reassessed 2023

Safeguards

Grievance mechanism present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents