Kasigau Corridor
Score Breakdown
Integrity
verified Additionality confirmed by the VVB (AENOR) and investment test documented in validation/monitoring reports.
missing Leakage treatment and reversals are inconsistently documented (leakage deduction reported as 8.2% in one report but 0% or 'not addressed' in others), and corrective actions remain open.
Transparency
verified Named VVB (AENOR) and recent monitoring period provided (2022 monitoring report dated 2024-10-30).
missing Key quantities conflict across documents (total ERR claimed and verified differ between validation reports from 2012, 2022, 2023), reducing clarity.
Claim Safety
verified Project is reported as not CORSIA-eligible (reduces double-claim risk).
missing Large and unresolved discrepancies in ERR issuance/claims and inconsistent leakage justification raise over-crediting risk.
Documentation
verified Large document set used (120 documents) and recent monitoring report dated 2024-10-30.
missing Extraction confidence is only medium and several corrective actions/clarifications remain open, lowering reliability.
Detailed Analysis
Integrity
Additionality is explicitly confirmed by the VVB (AENOR) via an investment test, and the project shows a buffer pool (13%) and a baseline reassessment in 2022 (monitoring/validation documents). However, leakage treatment is inconsistently recorded: some documents state a leakage deduction of 8.2% (monitoring report) while later validation documents show 0% or 'not addressed'. There are no reversal events reported in recent reports, but earlier documents did not address reversals. The presence of five corrective actions and four clarifications that are not closed (monitoring report, 2024-10-30) lowers confidence in implementation and monitoring.
Transparency
The VVB is named and a recent monitoring period (2022) and monitoring report (2024-10-30) are available, and a large document set (120 docs) is cited. Nevertheless, there are multiple contradictions in core reported numbers: total ERR claimed and verified differ across validation reports (2012 vs 2023/2024) and buffer-pool percentage is reported as 15 historically and 13 in the most recent validation. Extraction confidence is medium, which also reduces the transparency score.
Claim Safety
The project is reported as not CORSIA-eligible, which lowers double-claim risk. Despite that, contradictions in ERR issuance/claims (e.g., total ERR claimed 1,888,472 in a 2023 validation report vs 1,412,919 in a 2012 report; verified ERR figures also conflict across 2022/2023 reports) and inconsistent leakage justification create a meaningful risk of over-crediting. Open corrective actions further increase claim risk.
Documentation
Documentation is extensive (120 documents including PDD, monitoring report, validation report, issuance) and the most recent monitoring report is dated 2024-10-30. However, minimum extraction confidence is medium and several verification corrective actions/clarifications remain unclosed in the monitoring report, so the record is not fully reliable.
Overall
I privileged the most recent and higher-priority monitoring and validation documents when resolving contradictions: recent monitoring report and validation reports from 2023–2024 were given precedence over older validation reports (2012–2015) because they reflect the latest assessments and project updates (e.g., buffer pool of 13% from a 2024 validation/monitoring document vs 15% from 2015). For ERR totals I relied on the 2023/2024 validation-monitoring figures as most relevant for current claim assessment, but note that older validation reports show substantially different figures (2012). For leakage I treated the record as unreliable because both a leakage deduction of 8.2% (older monitoring entry) and a 0%/not-addressed position (later validation entries) appear; the monitoring report also states leakage justification is not addressed. These contradictions reduce scores for transparency, claim safety and integrity. Open corrective actions reported in the 2024 monitoring report further lower confidence. Overall the project sits in the mid-range: documented positive features exist, but inconsistent reporting and unresolved verification items prevent a higher score.
Audit Analysis
The project shows several positive integrity features (VVB-confirmed additionality, a buffer pool, and a recent baseline reassessment), but open corrective actions, contradictory reporting on key metrics (ERRs, leakage, safeguards) and some missing evidence reduce confidence. Documentation is extensive and recent but extraction confidence is only medium and some verification items remain unresolved.
Project Description
About the project The Kasigau Corridor REDD+ Project, a pioneer in wildlife conservation, protects over 200,000 hectares of dryland forest with over 11,000 wild elephants that live in this ecosystem (2000+ of those elephants call Rukinga their permanent home). The project provides social programs that impact over 116,000 local people and provides the local community of the Kasigau Corridor region with long-term jobs that replace unsustainable sources of income such as poaching, subsistence agriculture and illegal tree harvesting. In an area where wildlife and human survival were at odds, the project has created a market-driven solution to wildlife conservation through an expansive community-led, community-based conservation model, with profound and lasting impact. The Solution Wildlife Works engaged the community and made the case in 1998 for establishing the Rukinga Wildlife Sanctuary, covering 80,000 acres of forest. A community works project was established providing the local community with an alternative income stream to replace the need to poach wildlife and clear the forests. Locally hired rangers were hired and trained to be guardians of the wilderness and cattle owners agreed to remove the cattle to reduce conflict over resources on the land. The foundation of the project is job creation: Through carbon sales, Wildlife Works provides the local community of the Kasigau Corridor region in Southeast Kenya with long-term jobs that replace unsustainable sources of income such as poaching, subsistence agriculture and illegal tree harvesting, including: Jobs supporting education Jobs making eco-friendly products Jobs protecting wildlife Jobs managing the project Jobs helping farmers Jobs growing trees Progress The area protected has now expanded to over 200,00 hectares, which will offset 1.7 million tons of CO2 emissions per year over the next 30 years. The Kasigau Corridor REDD+ project, with the dryland Aca
Red Flags
- Contradictory ERR figures across documents (2012 vs 2023/2024 validation reports).
- Open corrective actions: five corrective actions and four clarifications reported as not closed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 323,049 | 323,049 | 0 | |
| 2012 | 1,036,037 | 736,037 | 300,000 | |
| 2013 | 2,722,170 | 2,251,712 | 470,458 | |
| 2015 | 1,156,271 | 1,098,146 | 58,125 | |
| 2016 | 1,669,745 | 644,790 | 1,024,955 | |
| 2017 | 1,665,110 | 668,552 | 996,558 | |
| 2018 | 1,443,407 | 281,087 | 1,162,320 | |
| 2019 | 1,377,897 | 499,861 | 878,036 | |
| 2020 | 1,609,384 | 211,656 | 1,397,728 | |
| 2021 | 1,637,325 | 421,440 | 1,215,885 | |
| 2022 | 1,642,971 | 50 | 1,642,921 | |
| Total | 16,283,366 | 7,136,380 | 9,146,986 |
Cosa migliorerebbe questo punteggio
- Close outstanding corrective actions and clarifications in the monitoring/validation records and publish updated verification statements.
- Provide a clear, consistent reconciliation of ERR claimed vs verified and an explicit, documented leakage justification (with method and numbers) in a public monitoring update.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed
buffer present, contradictions
deduction present but justification inconsistent
project baseline, recently reassessed
FPIC/grievance reported but records conflict
CORSIA not eligible; CCP status unclear
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
issuance
monitoring
- Kasigau Corridor PII_M8_Monitoring_Report_CCB v2.0_VCSv3.4_V3.1.pdf
- Project 612_Kasigau_Phase_II_SD-VISta_MR2.pdf
- Kasigau Corridor Phase II M9 MR Summary_Swahili 2.0.pdf
- Kasigau Corridor Phase II M7 MR Summary_English v2.pdf
- Kasigau Corridor PII_M8_Monitoring_Report_CCB v2.0_VCSv3.4_V2.pdf
- CCB_MON_REP_SUM_SWA_612_01JAN2015_31DEC2017.pdf
- +25 more
Other
pdd
validation
- VCS-Verification-Representation-Kasigau Phase II-m9.pdf
- VERIF_STA_612_01JAN2015_31DEC2017.pdf
- VCS612_SD-VISta_ValidationReport_v2.0-20231025.pdf
- VCS612_CCB_Verification_Statement.pdf
- 21050.00_KasigauPhaseII_CCB_VCS_VerifRep_Final_20211231.pdf
- 21050.00_KasigauPhaseII_VCS_VerifRepresentation_Final_20211231.pdf
- +30 more
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →