Kayaduzu Wind Power Plant, Turkey
Score Breakdown
Integrity
verified The verification report confirms additionality through an investment test and says the VVB validated it.
missing Leakage is only described as negligible, with no quantified deduction shown in the extracted record, and the record contains a contradiction on whether leakage was previously addressed.
Transparency
verified The project has a named VVB, a defined 2024 monitoring period, and a recent verification date in the extracted documents.
missing Verified and claimed issuance totals are not found, and the usage monitoring method and FNRB treatment are not stated in the available documents.
Claim Safety
verified The baseline method is stated as project-based and the baseline was last reassessed in 2021, which is better than an unstated baseline.
missing The project is marked CORSIA-eligible, while CCP status is not stated, so dual-claim risk is not fully resolved.
Documentation
verified The record draws on many extracted documents and includes a 2024 verification report with multiple corrective actions closed before issuance.
missing Extraction confidence is low, and the record still lacks several key fields such as buffer pool treatment, usage monitoring, and verified ERR totals.
Detailed Analysis
Integrity
The project has a positive integrity signal because the verification report confirms additionality through an investment test, and the VVB is named as Re Carbon Ltd. The monitoring record also says no reversal events were reported. However, leakage is only described as negligible without a quantified deduction, and the extracted record shows a contradiction on leakage treatment, which weakens confidence in the robustness of the crediting assumptions.
Transparency
Transparency is moderate because the project has a named verifier and a clearly defined 2024 monitoring period, with a recent report date. That said, the extracted record does not provide verified or claimed ERR totals, does not state the usage monitoring method, and does not include FNRB details. The low extraction confidence further reduces confidence that the public documentation is complete.
Claim Safety
Claim safety is middling. The baseline method is stated as project-based and the baseline was last reassessed in 2021, which is better than an unstated baseline, but the record does not provide the quantified leakage deduction or any usage-rate evidence. The project is marked CORSIA-eligible, while CCP status is not stated, so the dual-claim picture is incomplete and warrants caution.
Documentation
Documentation quality is limited by low extraction confidence and by several missing core fields, including buffer pool treatment, usage monitoring, FNRB, and verified issuance totals. On the positive side, the record references many source documents and the verification report notes that multiple corrective action and clarification requests were closed before issuance. The contradiction set also suggests the underlying document trail is not fully consistent across versions.
Overall
Overall, this is a plausible renewable project with some solid verification signals, but the evidence package is incomplete and internally inconsistent in several places. I privileged the more recent and more specific entries where dates were available, such as the 2024 verification-related facts and the later crediting-period statement, because they appear to reflect the latest documented status. The contradictions on additionality test type, benefit sharing, leakage, reversal treatment, and crediting period all point to reliability issues, so the score is held to a cautious mid-range.
Audit Analysis
This is a reasonably documented wind project with VVB-confirmed additionality and no reported reversals, but the evidence base is uneven and several key items are missing or contradictory. The project looks broadly credible, yet the lack of quantified leakage treatment, missing public MRV details, and low extraction confidence keep the score in the middle range.
Project Description
Developer: Eksim Enerji Anonim Sirketi Type: Wind Size: Large Scale Crediting period: 2012-07-01 → 2026-06-30 Estimated annual credits: 69213 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 13: Climate Action, Goal 8: Decent Work and Economic Growth
Red Flags
- Several core fields are not stated in the extracted record, including buffer pool treatment, usage monitoring, and verified issuance totals.
- The extracted record contains contradictions on additionality test type, benefit sharing, leakage treatment, reversal treatment, and crediting period, which reduces reliability.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 37,857 | 37,857 | 0 | |
| 2013 | 77,422 | 77,422 | 0 | |
| 2014 | 19,026 | 19,026 | 0 | |
| 2016 | 22,048 | 22,048 | 0 | |
| 2017 | 65,484 | 54,220 | 11,264 | |
| 2018 | 73,072 | 73,072 | 0 | |
| 2019 | 31,873 | 31,873 | 0 | |
| 2021 | 13,493 | 10,000 | 3,493 | |
| 2022 | 72,923 | 0 | 72,923 | |
| 2023 | 16,718 | 0 | 16,718 | |
| Total | 429,916 | 325,518 | 104,398 |
Cosa migliorerebbe questo punteggio
- Publish the verified and claimed emission reduction totals, along with the usage monitoring method and any leakage calculation or deduction.
- Resolve document inconsistencies by issuing a reconciled project record that explains the differing additionality, leakage, reversal, and crediting-period statements.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversals reported, buffer not stated
Negligible stated, no quantified deduction
Project baseline, reassessment timing limited
FPIC and grievance mechanism present
CORSIA-eligible, CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- (1)Monitoring Report_1st monitoring period_07.01.2012 to 04.30.2014_v5.pdf
- Kayaduzu_HEPP_Annual_Report.pdf
- Kayaduzu-WPP-Annual-Report.pdf
- Final_Ver Report_852 Kayaduzu Wind_Selen Cilasun_v04_18-09-2023-clean.pdf
- Final_MR_852 Kayaduzu Wind_v06_26-08-2024-clean.docx
- Kayaduzu_WPP-Project-Annual-Report.pdf
- +4 more
Other
pdd
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →