Audit Analysis
The Kayaduzu Wind Power Plant is a Gold Standard wind avoidance project with VVB-confirmed additionality, a closed-out corrective action record, and verified generation exceeding the pro-rata expectation by roughly 49%. However, the project-specific baseline (contradicting the PDD's jurisdictional claim), CORSIA eligibility creating dual-channel risk, and low extraction confidence across 18 documents temper the overall assessment.
Red Flags
- CORSIA eligibility is confirmed while CCP status is not stated, creating potential dual-channel crediting risk
- Baseline method is described as 'project-specific' in the 2024 verification report but 'jurisdictional' in the PDD — the more conservative (project-specific) reading is privileged
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and some facts may be incomplete
- Grid emission factor is from 2018 (six years old at the time of the 2024 verification), and no updated factor or methodology for updating is stated
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 37,857 | 37,857 | 0 | |
| 2013 | 77,422 | 77,422 | 0 | |
| 2014 | 19,026 | 19,026 | 0 | |
| 2016 | 22,048 | 22,048 | 0 | |
| 2017 | 65,484 | 54,220 | 11,264 | |
| 2018 | 73,072 | 73,072 | 0 | |
| 2019 | 31,873 | 31,873 | 0 | |
| 2021 | 13,493 | 10,000 | 3,493 | |
| 2022 | 72,923 | 0 | 72,923 | |
| 2023 | 16,718 | 0 | 16,718 | |
| Total | 429,916 | 325,518 | 104,398 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversals
0% deduction, thin justification
Project-specific, method contradiction
FPIC, grievance, safeguards present
CORSIA-eligible, CCP unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →