Skip to main content
CFCUrban Forest CarbonUnited StatesGeneral Methodologyv2.1

Kendall Reservation Woods Forest Carbon Offsets

CFC-kendall-reservation-woods-fore ↗

#65of 345 in United States#31of 59 in City Forest Credits (CFC)

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.0

Audit Analysis

The Kendall Reservation Woods project is a 40-year urban tree preservation credit under the CFC standard with a VVB-verified combined additionality test, a 10% buffer pool, and a quantified 18.3% leakage deduction. The main weaknesses are a project-specific (non-jurisdictional) baseline, the absence of an ex-ante lifetime emission estimate for pro-rata verification, and a minor acreage discrepancy noted by the verifier. Overall the project is moderately robust with no material compliance failures.

Red Flags

  • Project-specific baseline rather than a jurisdictional or standardised baseline, increasing sensitivity to local land-use assumptions
  • No ex-ante lifetime emission estimate found in the extracted record, preventing a pro-rata over/under-delivery check against the 2,082 tCO₂e verified for the first monitoring period
  • PDD (Oct 2022) does not address reversal risk, while the verification report (Jan 2023) reports none — a documentation gap in the project design document

Credit Vintages

IssuedRetiredAvailable
2023
2,08202,082
Total2,08202,082

Risk Indicators

Additionality

VVB-verified combined test

Permanence

mixed evidence / unresolved risk

Leakage

18.3% quantified deduction

Baseline

Project-specific, no reassessment date

Safeguards

Safeguards mentioned, FPIC/grievance not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents