Score Breakdown

Integrity

verified Additionality confirmed by the validation report (investment test) and baseline reassessed in 2024 (validation_report; monitoring_report).

missing Multiple corrective action requests and material findings listed (CAR01, FAR01 and many CAR/CL entries in the monitoring report), and no buffer pool percentage stated.

Transparency

verified VVB named (4K Earth Science) and monitoring period provided (monitoring_report 2024‑04‑01 — 2025‑03‑31).

missing Key emission figures are missing from extracted records (total ERR claimed/verified and grid emission factor not stated) and extraction confidence is low.

Claim Safety

verified FNRB uses the national default (0.92) and leakage deduction quantified at 5% with justification (monitoring_report 2022‑07‑29).

missing Project is CCP‑approved (approved status present) and CORSIA eligibility is not stated — increases double‑claim risk; usage rate figures contradict across documents (79 vs 90).

Documentation

verified Multiple supporting documents listed (validation report, monitoring report, PDD, stakeholder consultation) and 30 documents were used.

missing Minimum extraction confidence is low and several contradictions exist across documents; some corrective actions remain listed in monitoring records (doc_date 2022‑07‑29).

Detailed Analysis

Integrity

Additionality is supported — the validation report confirms an investment test and the VVB confirmed additionality (validation_report 2021). The baseline is project‑level but was reassessed in 2024 (monitoring_record), and leakage is quantified with a 5% deduction and a quantified justification (monitoring_report 2022‑07‑29). However, permanence is weakened because no buffer pool percentage is stated in the extracted records and there are many corrective action requests and material findings reported in the monitoring record (multiple CAR/CL entries and CAR01, FAR01 listed), which reduce confidence in implementation.

Transparency

Transparency is mixed: the VVB is named (4K Earth Science) and a recent monitoring period is provided (2024‑04‑01 — 2025‑03‑31), but critical emission figures (total ERR claimed and verified, grid emission factor) are not found in the extracted record. The low extraction confidence flag indicates at least one key document was poorly readable, which lowers transparency and the ability to cross‑check numbers.

Claim Safety

There is measurable mitigation of over‑claim risk: the project uses the national default FNRB (0.92) and applies a 5% leakage deduction with justification. But the project is CCP‑approved (status: approved), CORSIA eligibility is not stated, and there are contradictions in monitored usage rates (verified 79 vs earlier 90), which raise dual‑claim and over‑crediting concerns.

Documentation

Documentation coverage appears broad (validation report, monitoring report, PDD, stakeholder consultation; n_docs_used = 30) but the minimum extraction confidence is low and the latest extracted monitoring report is dated 2022‑07‑29. Corrective actions remain recorded (CAR01, FAR01), and some important fields (buffer pool pct, grid EF, ERR totals) are missing from the extracted record. These gaps lower the documentation score.

Overall

I privileged the more recent and higher‑priority verification/monitoring documents where contradictions exist. Specifically: fPIC — the validation report (2021) indicating no FPIC is preferred over the older PDD claim; usage assumptions — the more recent 2024 extraction value (69) is preferred over a 2021 90 figure; leakage justification — the monitoring report (2022) showing a quantified justification is preferred over a PDD that did not address leakage; additionality verification — the validation report (2021) confirming additionality is privileged over an unknown 2024 source; usage rate verified — the more recent reported 79 (2024 extraction) is preferred to the 90 figure in the 2022 monitoring report; benefit sharing — the validation report (2021) description is preferred over a 2017 stakeholder note; usage monitoring method — the monitoring report's annual survey is preferred where 'assumed' appeared elsewhere; additionality test type — the validation report's investment test is preferred to the PDD's combined test; reversal events — recent records reporting no reversals are preferred; crediting period — the monitoring report (2022) crediting period was used rather than an unknown future record. These contradictions and the low extraction confidence reduce the overall score despite some positive evidence. If documentation quality were higher and remaining CARs closed with emission figures reported, scores would improve.

Audit Analysis

Moderate integrity but several quality concerns. Additionality and baseline are supported by a validation/monitoring record, but multiple corrective actions, contradictions between documents, low extraction confidence and missing emission data weaken confidence and increase risk of over‑crediting.

Project Description

In Kenya, over 50 million people live without reliable access to safe drinking water, with 41% of the population relying on unsafe sources. Open water supplies are often contaminated, forcing many rural households to depend on boiling water as their only option for safe consumption. GivePower has developed an innovative solution: solar-powered desalination plants that deliver clean, safe drinking water to coastal communities. These plants use photovoltaic cells to power advanced desalination technology, providing thousands of households with a sustainable and reliable source of potable water. CO2balance is proud to partner with GivePower, an award-winning non-profit that implements clean energy solutions across the Global South. Through carbon finance, we help cover the ongoing operational and maintenance costs of these plants, ensuring that cutting-edge, technology-driven solutions remain accessible and sustainable for the communities that need them most.   Project Impacts and Benefits Since its launch in September 2020, the project has delivered the following impacts for communities in coastal Kenya:   Climate Action (SDG 13):   The project prevents almost 27,000 tonnes of CO₂ emissions each year by reducing the need to boil unsafe water, directly contributing to global climate goals. Good Health and Wellbeing (SDG 3):  In 2023 alone, over 37,000 additional people gained access to safe drinking water through the project, significantly reducing the risk of waterborne diseases. Gender Equality (SDG 5):  Households save more than two hours every day that was previously spent collecting water. This has a particularly positive impact on women and girls, freeing up time for education, livelihoods, and other opportunities. Clean Water and Sanitation (SDG 6):  Almost 40,000 individuals now enjoy reliable access to clean, safe water, improving daily living conditions and strengthening community resilience. Certification d

Red Flags

  • Low extraction confidence in the source documents (min_extraction_confidence = low)
  • Multiple corrective actions and material findings reported (several CARs and required corrective actions)
  • Project is CCP-approved (dual-channel risk) and CORSIA eligibility not stated

Credit Vintages

Issued Retired Available
2020
3,085 3,085 0
2021
12,450 12,450 0
2022
15,917 11,965 3,952
2023
26,982 0 26,982
2024
7,951 0 7,951
Total 66,385 27,500 38,885

Cosa migliorerebbe questo punteggio

  • Provide clear, readable monitoring reports that include total ERR claimed and verified and the grid emission factor.
  • Resolve outstanding corrective actions and disclose buffer pool percentage or other permanence protections; clarify CORSIA eligibility and CCP double‑claim controls.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB‑confirmed

Permanence

no buffer stated

Leakage

quantified deduction

Baseline

project baseline; reassessed

Safeguards

some safeguards documented

Double-claim

CCP approved / CORSIA unclear

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-23 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti