Kenya Solar Water Farm Project
GS-2946 ↗ · current registry ID: GS10987
#1129of 1935 in Renewable energy#60of 157 in Kenya#856of 1801 in Gold Standard (GS)
Audit Analysis
The GivePower Kenya Solar Water Farms project displaces charcoal and firewood with solar water heating, with additionality confirmed by the VVB via an investment test and a 5% quantified leakage deduction. However, the project carries significant data-quality concerns: extensive corrective actions for calculation errors and missing MR sections, a 14-percentage-point gap between assumed (90%) and verified (76%) usage rates, and 538 water-quality failure days in 2023 that undermine the displacement claim. The project delivered only 73% of its pro-rata ex-ante expectation for the monitoring period, which is conservative but reflects operational underperformance.
Red Flags
- 538 water-quality failure days recorded in 2023 (monitoring report), directly undermining the assumption that displaced users actually use the solar-heated water
- Usage rate assumed at 90% in the monitoring report but verified at only 76% in the 2026 verification report — a 14-percentage-point overstatement of actual displacement
- Six corrective actions (CAR01–CAR06) in the latest monitoring report flag calculation errors, formula errors, missing sections, and inconsistent data in the ERs spreadsheet
- Two approved deviations (DEV_663, DEV_664) exempt the project from monitoring survey and minimum sample-size requirements, weakening MRV rigor
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 3,085 | 3,085 | 0 | |
| 2021 | 12,450 | 12,450 | 0 | |
| 2022 | 15,917 | 11,965 | 3,952 | |
| 2023 | 26,982 | 0 | 26,982 | |
| 2024 | 7,951 | 0 | 7,951 | |
| Total | 66,385 | 27,500 | 38,885 |
Risk Indicators
VVB-confirmed investment test
no reversals reported
5% quantified deduction
Project-specific baseline, reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →