Skip to main content
GSWindTurkeyACM0002

Kozbeyli 30 MW Wind Farm Project, Turkey

GS-1404 ↗ · current registry ID: GS580

#874of 1935 in Renewable energy#174of 295 in Turkey#525of 1801 in Gold Standard (GS)#687of 1287 in ACM0002

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.0
Documentation
4.5

Audit Analysis

The Kozbeyli 30 MW wind farm is a straightforward renewable-energy avoidance project with VVB-confirmed additionality and a verified ERR that closely matches the pro-rata lifetime expectation (~99%). However, the project-specific baseline, an extensive list of 30+ corrective actions in the verification report, and several unresolved data-quality issues (inconsistent turbine counts, apportioning errors, missing methodology citations) materially weaken confidence in the underlying data. The project is not yet due for baseline reassessment under Gold Standard rules, and reversal risk is inherently low for a wind avoidance project.

Red Flags

  • 30+ corrective actions flagged in the verification report, including incorrect apportioning calculations, inconsistent turbine counts (15 vs 14), and missing methodology citations — indicating significant data-quality weaknesses in the monitoring report
  • Crediting period contradiction: the monitoring report (Dec 2022) states 2013–2066 (53 years) while the verification report (Sep 2024) states 2020–2026 (7 years); the implausible 53-year period undermines confidence in the monitoring report's internal consistency
  • Grid emission factor discrepancy: 0.6488 (verification report, 2020) vs 0.7424 (appendix, undated) — a ~14% difference that could affect the magnitude of claimed reductions
  • No buffer pool percentage stated in any available document, leaving permanence risk unquantified even though reversal risk is low for a wind project

Credit Vintages

IssuedRetiredAvailable
2023
50,383050,383
2024
13,220013,220
Total63,603063,603

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, reasonable for wind

Baseline

Project-specific, reassessed 2023

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents