KUAMUT RAINFOREST CONSERVATION PROJECT
#70of 261 in Soil carbon#7of 16 in Malaysia#606of 1339 in Verra (VCS)#6of 10 in VM0010
Audit Analysis
The Kuamut Rainforest Conservation Project is a VCS ALM project with VVB-confirmed additionality, a 12% buffer pool, and quantified leakage, but is undermined by a project-specific baseline, a significant downward revision of the lifetime ex-ante estimate (from ~27.5 M to ~16.3 M tCO₂e between the 2024 and 2025 verification reports), extensive material findings (43 corrective action requests in one cycle), and unresolved commenter challenges to additionality and the crediting-period start date. The project delivered roughly 145 % of the pro-rata expectation for the 2024–2025 monitoring window, which is encouraging, but the data-quality and baseline concerns limit confidence in the long-term claim.
Red Flags
- Lifetime ex-ante ERR estimate dropped from 27,493,288 tCO₂e (2024 VR) to 16,291,489 tCO₂e (2025 VR) — a 41 % reduction that materially weakens the ex-ante basis for the credit claim.
- 43 Corrective Action Requests and 6 Clarification Requests were raised in a single verification cycle, indicating systemic documentation and monitoring-quality gaps.
- A commenter formally challenged both the additionality of the project and the validity of the 2015 crediting-period start date; these challenges are not fully resolved in the extracted record.
- Leakage deduction figure is inconsistent between the monitoring report (28.8 %) and the verification report (0.288 %), a 100-fold discrepancy that raises data-reliability concerns.
- Baseline reassessment is now due (10-year interval from the December 2015 project start) but was not conducted during the 2024–2025 monitoring period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 387,897 | 366,650 | 21,247 | |
| 2018 | 437,154 | 433,613 | 3,541 | |
| 2019 | 987,082 | 973,168 | 13,914 | |
| 2020 | 1,108,187 | 849,512 | 258,675 | |
| 2021 | 997,777 | 846,201 | 151,576 | |
| 2022 | 788,266 | 479,705 | 308,561 | |
| 2023 | 786,547 | 585,198 | 201,349 | |
| Total | 5,492,910 | 4,534,047 | 958,863 |
Risk Indicators
VVB-confirmed but commenter-challenged
12% buffer, one 2023 flood event accounted for
0.288% quantified but 100× discrepancy with MR
Project-specific; 10-yr reassessment now due
FPIC, grievance mechanism, benefit sharing documented
CCP not mentioned; CORSIA not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →