Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalChile Registry: RegisteredACM0001

La Yesca Landfill Gas Project

VCS-4056 ↗

#152of 189 in Methane#25of 31 in Chile#1142of 1339 in Verra (VCS)#129of 159 in ACM0001

4.1/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
4.5
Documentation
3.2

Audit Analysis

The La Yesca Landfill Gas Project is a registered VCS LFG-to-energy project in Chile with VVB-confirmed additionality, but it carries significant documentation and baseline-validity concerns. The validation report identified 16 material findings (all subsequently closed), including calculation errors in emission-reduction parameters, and the project lacks a buffer pool, any monitoring data, and a confirmed FPIC process. Five contradictions between the PDD and the validation report—on FPIC, benefit sharing, leakage, legal capture requirement, and the lifetime ERR—further erode confidence in the project's data integrity.

Red Flags

  • 16 material findings in the validation report, including calculation errors in BECH4, DOCj, and TDL values and contradictory statements about the baseline flare, all of which undermine baseline validity even though they were closed
  • No buffer pool is in place and no reversal-risk mechanism is documented; the project simply states reversals are 'not applicable' without a quantitative safety net
  • FPIC status is directly contradicted: the PDD (2025-10-30) states FPIC was conducted, while the validation report (2025-10-31) records it as not conducted; the more authoritative validation report is privileged
  • No monitoring or verification report is available for a project whose crediting period began in March 2023, leaving roughly 2.7 years of operations unverified
  • Leakage deduction is 0% with only a 'deemed negligible' justification, and the PDD (2023) did not address leakage at all

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

'not applicable' claim only

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, modelled; 16 material findings

Safeguards

Grievance mechanism present; FPIC not confirmed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents