Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Turkey Registry: RegisteredACM0002

Lamas III-IV 37.3 MW Hydroelectric Power Plant Project, Turkey

VCS-726 ↗

#710of 1935 in Renewable energy#145of 295 in Turkey#408of 1339 in Verra (VCS)#551of 1287 in ACM0002

5.5/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

The Lamas III-IV hydro project is a VCS-registered renewable energy project with VVB-verified additionality and no inherent reversal risk, but it is undermined by a project-specific baseline, 21 corrective action requests during verification, a 78% pro-rata under-delivery against the ex-ante estimate, and numerous cross-document contradictions that erode confidence in the data record. The low extraction confidence and missing key parameters (FNRB, usage rates, buffer pool) further limit the strength of the evidence base.

Red Flags

  • 21 Corrective Action Requests and 8 Clarification Requests were raised during the 2024 verification, indicating significant data-quality issues in the monitoring report, including meter-reading errors and missing PMUM records
  • Baseline method is contradictory across documents: the 2024 verification report states 'project' while the 2022 verification report states 'jurisdictional', raising questions about which baseline was actually applied
  • FPIC status is directly contradictory: the 2024 verification report records FPIC as not conducted, while the 2024 monitoring report records it as conducted
  • Min extraction confidence is rated low, meaning at least one key document was poorly readable, reducing reliability of the extracted data
  • The project delivered only ~78% of the pro-rata ex-ante expectation for the elapsed monitoring period (99,540 vs ~127,706 tCO2e), a gap the VVB flagged as a -66.87% difference against the lifetime estimate

Credit Vintages

IssuedRetiredAvailable
2009
5,2535,2530
2010
44,03944,0390
2011
49,47449,4740
2012
76,45776,4570
2013
69,13269,1320
2015
25,53725,5370
2016
4,5474,5470
2017
33,23633,16967
2018
22,91122,9110
2019
73,00872,194814
Total403,594402,713881

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Hydro avoidance – no reversal risk

Leakage

Quantified at 0%, reasonable for hydro

Baseline

Project-specific; reassessment date unstated

Safeguards

Grievance present; FPIC contradictory

Double-claim

Not CORSIA-eligible; CCP status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents