Lankao Geothermal Based Space Heating System

VCS-4383 ↗

#1042of 1935 in Renewable energy#581of 1084 in China#661of 1339 in Verra (VCS)#9of 13 in AM0072

5.1/ 10
Integrity
4.8
Transparency
5.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

The Lankao Geothermal Space Heating project (VCS-4383) is a coal-displacing geothermal heating system in China with VVB-confirmed additionality, but it carries notable concerns: a project-specific baseline, a 0% leakage deduction justified only as 'deemed negligible,' and a large volume of material findings (17 CARs, 18 corrective actions) that point to significant initial documentation errors. The project delivered roughly 65% of its pro-rata ex-ante expectation for the first monitoring period, which is conservative but suggests the lifetime estimate may have been optimistic.

Red Flags

  • 17 Corrective Action Requests and 18 corrective actions were raised during verification, including recalculation of the ex-ante ER value due to incorrect HSy values and correction of inconsistent parameter values — indicating substantial initial documentation errors
  • Leakage deduction of 0% justified solely as 'deemed negligible' for a project displacing coal-based heating in Lankao County, with no quantified analysis of displaced coal potentially being used elsewhere
  • Contradiction in total ERR figures: the PDD (Feb 2024) reports 785,080 tCO₂e while the validation report (Feb 2024) reports 67,637 tCO₂e — a 12× difference that, while likely reflecting lifetime vs. per-period scope, was not explicitly reconciled in the documents

Credit Vintages

IssuedRetiredAvailable
2021
11,37110,787584
2022
32,926032,926
2023
23,340023,340
Total67,63710,78756,850

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

coal-heating reversion risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, not jurisdictional

Safeguards

Grievance mechanism present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AM0072

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents