Lapwall Factory 1
#2of 8 in Finland#30of 111 in Puro.earth (PUR)
Audit Analysis
Lapwall Factory 1 is a Puro carbon-removal project (CO2 captured into plasterboard) verified by DNV with no material findings and a 10% buffer pool, but the extracted record lacks explicit documentation of the additionality test, baseline method, leakage treatment, and safeguards, creating meaningful evidence gaps. The exact match between claimed and verified removals (5,428.08 t) suggests no over-claiming, yet the absence of an ex-ante lifetime estimate prevents a pro-rata delivery check.
Red Flags
- Additionality test type and VVB confirmation of additionality are not stated in any extracted document, leaving the core additionality claim unverified in the record
- Leakage deduction and justification are entirely absent from the extracted record for a project whose 50-year permanence claim depends on the material not being demolished and the CO2 released
- Safeguards, FPIC, and grievance mechanism are not documented in the available record
- CORSIA eligibility is not stated, creating ambiguity about dual-channel (CCP + CORSIA) exposure
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 4,278 | 4,278 | 0 | |
| 2022 | 2,297 | 2,297 | 0 | |
| Total | 6,575 | 6,575 | 0 |
Risk Indicators
Test type and VVB confirmation not stated in record
50-yr claim; reversal risk not explicitly addressed
No deduction or justification found in extracted record
Method not stated; Puro methodology v2.0 referenced but project-level detail absent
FPIC, grievance mechanism, and safeguards not documented in available record
CCP eligible; CORSIA status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →