Skip to main content
VCSEnergy demandIndia Registry: RegisteredAMS-II.C

LED distribution project by EKI Energy Services Limited

VCS-3460 ↗

#817of 975 in India#1072of 1339 in Verra (VCS)#12of 14 in AMS-II.C

4.3/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

This VCS-registered LED distribution project in India has a VVB-confirmed investment additionality test and a credible methodology (AMS II.C v15), but the validation process surfaced eight corrective action requests, eight clarification requests, and one unresolved forward action request regarding verification of baseline lamp destruction. The leakage treatment was downgraded from a quantified approach in the PDD to a 0% 'deemed negligible' deduction in the validation report, and a genuine discrepancy in assumed usage rates (3.5 vs 1,825 hours) remains between the PDD and the validation report. The project is still at the validation stage with no monitoring data, and the low extraction confidence across the document set limits the reliability of the available evidence.

Red Flags

  • Unresolved Forward Action Request: the VVB could not verify that collected baseline incandescent lamps (ICLs) were actually destroyed, undermining the energy-savings claim
  • Leakage treatment downgraded from 'quantified' in the PDD to 0% 'deemed negligible' in the validation report, with no quantified deduction for a distribution project where physical products change hands
  • Genuine discrepancy in assumed usage rate: the PDD states 1,825 hours (≈5 h/day) while the validation report states 3.5 (presumably h/day), a ~43% difference that directly affects the ERR
  • Stakeholder consultation was conducted in only one state for a pan-India project, raising representativeness concerns
  • Low extraction confidence across the document set, with one document of unknown type, limits the reliability of the extracted evidence

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed but 8 CARs and 1 open FAR

Permanence

Energy-efficiency project; non-permanence N/A

Leakage

0% deduction, deemed negligible; PDD initially quantified

Baseline

Project-specific; no reassessment date; not yet due under VCS

Safeguards

Grievance mechanism present; FPIC not stated; single-state consultation

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS II.C. Demand-side energy efficiency activities for specific technologies

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents