Vai al contenuto principale
PUR Alternative Materials Other United Kingdom Documentazione completa General Methodology v2.0

Leeds Production Facility

PUR-625222 ↗

5.0 / 10
Integrity
5.2
Transparency
5.0
Claim Safety
4.6
Documentation
5.4

Score Breakdown

Integrity

verified The verification report confirms additionality via an investment test and reports no material findings.

missing Leakage is not addressed and the baseline is project-specific with no reassessment date found in the extracted record.

Transparency

verified A named VVB (350Solutions) and a defined monitoring period (2025-04-01 to 2025-06-30) are provided in the verification record.

missing Key MRV figures are inconsistent across documents (verified removals conflict) and the claimed removals figure is not found in the extracted record.

Claim Safety

verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk.

missing Over-crediting risk is elevated by the contradiction in verified removals and the required correction to fossil CO2 subtraction in the removals calculation.

Documentation

verified The extracted record references a verification report dated 2025-12-19 and indicates 17 documents were used.

missing Evidence document titles are not identifiable in the extracted record and extraction confidence is only medium, with several key fields not found.

Detailed Analysis

Integrity

The verification report (2025-12-19) confirms additionality using an investment test and reports no material findings, which supports basic additionality credibility. However, leakage is explicitly noted as not addressed in the extracted record, and no leakage deduction is provided, weakening integrity for a material-based removal pathway. The baseline is described as project-specific and the timing of any baseline reassessment is not found in the extracted record, increasing baseline robustness uncertainty. Permanence risk appears managed only partially: no reversals are reported, but there is no buffer pool contribution (0%), so the project relies on other controls not evidenced here.

Transparency

The extracted record provides a named VVB (350Solutions) and a clear monitoring period (2025-04-01 to 2025-06-30), which supports traceability. Transparency is reduced because the total removals claimed are not found in the extracted record, and there is a major inconsistency in the verified removals across documents. The verification report (2025-12-19) also required corrective actions, indicating that the underlying quantification and disclosures needed improvement. Registry completeness is mixed: a registry code is provided (PUR-625222), but supporting public document identifiers are not available beyond “unknown.”

Claim Safety

The project is stated as not CORSIA-eligible, which lowers the risk of high-impact aviation claims. Claim safety is nonetheless weakened by the contradiction in verified removals (1,706 vs 14,873) across documents, which creates a clear over-crediting/over-claiming risk until reconciled. The verification report (2025-12-19) required correction of the fossil CO2 subtraction in the CORC calculation file, directly indicating a risk that removals were miscalculated prior to correction. CCP status is not found in the extracted record, leaving uncertainty about alignment with higher-integrity claim frameworks.

Documentation

Documentation coverage is moderate: the extracted record indicates 17 documents were used and includes a verification report dated 2025-12-19, suggesting recent third-party review. However, the evidence document list is not identifiable (listed as “unknown”), limiting auditability for an external reviewer. Several key fields (e.g., claimed removals, leakage deduction, baseline reassessment timing, usage monitoring method) are not found in the extracted record, indicating gaps. Extraction confidence is medium, so some caution is warranted in relying on the completeness of extracted details.

Overall

Overall quality is mid-range because additionality is VVB-confirmed and no reversals are reported, but leakage and baseline robustness are not evidenced and quantification required correction. Contradictions materially reduce confidence: for verified removals, I privilege the 1,706 figure because it aligns with the most recent verification report date in the extracted record (2025-12-19) and is therefore likely the latest verified outcome; the 14,873 figure (dated 2024-12-27) is treated as superseded or referring to a different scope/period. For the crediting period contradiction, I privilege 2023-10-01 to 2024-09-30 because it is associated with the later document date (2024-12-27) and is more likely the updated crediting window; the earlier 2022-10-01 to 2023-09-30 is treated as prior. For safeguards, I privilege the later-dated indication that safeguards were mentioned (2025-06-25) over the earlier (2025-04-01), but the inconsistency still lowers confidence and scores.

Audit Analysis

The project has VVB-confirmed additionality (investment test) and no reversals reported, but key integrity elements like leakage treatment and baseline reassessment timing are not evidenced in the extracted record. Multiple cross-document inconsistencies—especially in verified removals—raise reliability and over-crediting risk, and the VVB required corrections to the fossil CO2 subtraction and marketing disclaimers.

Project Description

PUR-625222 — Alternative Materials Other

Red Flags

  • Large contradiction in verified removals (1,706 vs 14,873) across documents, creating material uncertainty about issued/verified credit volume.
  • Leakage is not addressed and no leakage deduction is stated, despite being a key integrity element for material-based carbon removal accounting.
  • Corrective action required to fix the fossil CO2 subtraction in the CORC calculation file, indicating a quantification error in the removals calculation.
  • Safeguards reporting is inconsistent across documents and no grievance mechanism or FPIC is evidenced in the extracted record.

Credit Vintages Exhausted

Issued Retired Available
2023
9,195 9,195 0
2024
24,570 24,570 0
2025
8,321 8,321 0
Total 42,086 42,086 0

Cosa migliorerebbe questo punteggio

  • Publish a reconciled, period-specific removals table that clearly explains the 1,706 vs 14,873 discrepancy and links each figure to a specific monitoring/crediting period and verification statement.
  • Provide a documented leakage assessment (and deduction if applicable) consistent with the methodology, including system boundaries and justification.
  • Disclose the corrected CORC calculation approach (including fossil CO2 subtraction) and provide an auditable change log showing what was corrected and why.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversals reported, but no buffer pool

Leakage

Leakage not addressed

Baseline

Project-specific baseline; reassessment not evidenced

Safeguards

Safeguards inconsistently documented; no FPIC/grievance

Double-claim

Not CORSIA-eligible; CCP status not evidenced

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-02 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti