Skip to main content
CFCUrban Forest CarbonUnited StatesGeneral Methodologyv2.1

Leroy Concord Forest Carbon Offsets

CFC-leroy-concord-forest-carbon-of ↗

#35of 345 in United States#18of 59 in City Forest Credits (CFC)

6.3/ 10
Integrity
6.8
Transparency
5.8
Claim Safety
6.2
Documentation
6.3

Audit Analysis

Hemlock Ridge Forest is a 40-year urban tree preservation project under the City Forest Credits standard with a VVB-confirmed additionality test, a 10% reversal buffer, and a quantified 18.3% leakage deduction. The project-specific baseline and the absence of stated FPIC, grievance mechanism, and CORSIA/CCP eligibility create moderate uncertainty. No material findings or corrective actions were reported, and ERR figures are internally consistent across documents.

Red Flags

  • Contradiction on reversal events: the verification report (Feb 2024) states reversals were 'not addressed' while the validation report (Mar 2024) reports 'none reported'; the 10% reversal pool (4,130 credits) mitigates but does not fully resolve the ambiguity
  • Project-specific baseline with no stated reassessment date, limiting confidence in long-term (40-year) baseline validity
  • FPIC and grievance mechanism are not documented in the extracted record, leaving community safeguards unverified

Credit Vintages

IssuedRetiredAvailable
2024
9,64009,640
2025
9,64009,640
2026
9,64009,640
Total28,920028,920

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal reporting inconsistent

Leakage

18.3% quantified deduction

Baseline

Project-specific; reassessment date not stated

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents