Skip to main content
GSBiomass, or Liquid Biofuel - HeatSouth AfricaGeneral Methodologyv2.1

Letaba Biomass to Energy Project

GS-833 ↗ · current registry ID: GS467

#138of 352 in Biomass#26of 59 in South Africa#1083of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
3.0
Documentation
5.5

Audit Analysis

The Letaba Biomass to Energy Project has VVB-verified additionality and a reputable verifier (TÜV NORD CERT), but suffers from severe under-delivery (approximately 5% of the pro-rata annual expectation), a project-specific baseline not reassessed since 2011, a 0% leakage deduction with contradictory justifications across verification reports, and multiple material findings including the non-implementation of Phase 2 (boiler fuel switch). The project's operational track record raises significant concerns about the robustness of its ex-ante estimates and the reliability of its credit volumes.

Red Flags

  • The 2024 monitoring report shows only 987 tCO2e verified against a pro-rata annual expectation of roughly 16,900–19,900 tCO2e (lifetime ex-ante of 168,826–198,881 divided by a 10-year crediting period), representing delivery of only about 5% of the expected rate for the elapsed period.
  • Phase 2 of the project (boiler fuel switch) was not implemented during the monitoring period and was still not implemented at the time of the 2018 verification, meaning a core component of the project design was never executed.
  • Leakage justification is contradictory: the 2015 verification report describes leakage as 'quantified' while the 2018 verification report describes it as 'deemed negligible,' yet the deduction in both cases is 0%.
  • The baseline was last reassessed in 2011 and has not been updated in over 13 years, despite the project-specific (non-jurisdictional) baseline method.

Credit Vintages

IssuedRetiredAvailable
2012
2062060
2013
2,8852,8850
2014
3,1973,1970
2015
1,1911,1910
2016
1,8521,82131
2017
1,0241,0240
Total10,35510,32431

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

operational instability

Leakage

0% deduction; contradictory justifications

Baseline

Project-specific; last reassessed 2011

Safeguards

FPIC done; grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.