Letaba Biomass to Energy Project
GS-833 ↗ · current registry ID: GS467
#138of 352 in Biomass#26of 59 in South Africa#1083of 1801 in Gold Standard (GS)
Audit Analysis
The Letaba Biomass to Energy Project has VVB-verified additionality and a reputable verifier (TÜV NORD CERT), but suffers from severe under-delivery (approximately 5% of the pro-rata annual expectation), a project-specific baseline not reassessed since 2011, a 0% leakage deduction with contradictory justifications across verification reports, and multiple material findings including the non-implementation of Phase 2 (boiler fuel switch). The project's operational track record raises significant concerns about the robustness of its ex-ante estimates and the reliability of its credit volumes.
Red Flags
- The 2024 monitoring report shows only 987 tCO2e verified against a pro-rata annual expectation of roughly 16,900–19,900 tCO2e (lifetime ex-ante of 168,826–198,881 divided by a 10-year crediting period), representing delivery of only about 5% of the expected rate for the elapsed period.
- Phase 2 of the project (boiler fuel switch) was not implemented during the monitoring period and was still not implemented at the time of the 2018 verification, meaning a core component of the project design was never executed.
- Leakage justification is contradictory: the 2015 verification report describes leakage as 'quantified' while the 2018 verification report describes it as 'deemed negligible,' yet the deduction in both cases is 0%.
- The baseline was last reassessed in 2011 and has not been updated in over 13 years, despite the project-specific (non-jurisdictional) baseline method.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 206 | 206 | 0 | |
| 2013 | 2,885 | 2,885 | 0 | |
| 2014 | 3,197 | 3,197 | 0 | |
| 2015 | 1,191 | 1,191 | 0 | |
| 2016 | 1,852 | 1,821 | 31 | |
| 2017 | 1,024 | 1,024 | 0 | |
| Total | 10,355 | 10,324 | 31 |
Risk Indicators
VVB-confirmed combined test
operational instability
0% deduction; contradictory justifications
Project-specific; last reassessed 2011
FPIC done; grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →