Skip to main content
ICRAvoidance / ReductionITVM0042

LIFE VitiCaSe

ICR-396 ↗

#159of 261 in Soil carbon#67of 154 in Intl. Carbon Registry (ICR)#14of 25 in VM0042

4.4/ 10
Integrity
4.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

LIFE VitiCaSe is a very early-stage soil-carbon avoidance project in Italy (ICR registry) with a combined additionality test and a 10% buffer pool, but critical verification gaps remain: no independent VVB is identified, reversal risk is not formally addressed, and the project-specific baseline lacks a documented reassessment schedule. The project is too new for monitoring data, so claim safety rests largely on the ex-ante estimate, which is internally consistent but rests on a project-specific baseline and a 0% leakage deduction that is thin for a soil-carbon methodology.

Red Flags

  • No independent verification body (VVB) is named in any available document, and additionality verification status is not confirmed, leaving the combined additionality test unvalidated by a third party.
  • Reversal events are marked as 'not addressed' in the extracted record for a soil-carbon project where carbon loss is an inherent risk; the 50-year winery maintenance commitment is a contractual pledge, not a formal permanence mechanism.
  • Leakage is deemed negligible with a 0% deduction, which is a weak justification for a soil-carbon project where displaced management practices could shift emissions to adjacent parcels.
  • Free, Prior and Informed Consent (FPIC) was not conducted, and no grievance mechanism is documented, creating a safeguards gap for a project affecting local wineries.

Credit Vintages

IssuedRetiredAvailable
2025
4,30204,302
2026
5,10805,108
2027
4,42404,424
Total13,834013,834

Risk Indicators

Additionality

Combined test present but VVB verification unconfirmed

Permanence

10% buffer pool present; reversal risk not formally addressed

Leakage

0% deduction deemed negligible; thin justification for soil carbon

Baseline

Project-specific, mixed measured/modelled; reassessment timing not stated

Safeguards

Safeguards mentioned; FPIC not conducted; grievance mechanism absent

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-08VM0042

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents