The Liling LFG Power Generation Project is a landfill gas-to-energy project with a solid additionality assessment (combined test, VVB-confirmed) and no permanence risk since the gas is consumed rather than stored. However, three material findings in the verification report—including an incorrect methane GWP value and a monitoring-period inconsistency—signal quality-control weaknesses, and contradictions between the 2021 verification and 2024 monitoring reports on leakage treatment and baseline characterisation reduce confidence in the data record.
Red Flags
- The verification report (2021) recorded the GWP of CH4 as 21 or 25 instead of the correct 28 tCO2e/tCH4, a fundamental calculation error that required corrective action
- The monitoring period stated in the ER and Joint PD&MR (Version 1.0) was inconsistent with the public comment version, indicating a documentation control failure
- Leakage justification is contradictory: the 2021 verification report states 'deemed negligible' while the 2024 monitoring report states 'quantified', leaving the actual treatment ambiguous
- Three material findings required corrective actions, indicating the project documentation did not meet VCS quality standards at the time of verification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 19,258 | 19,258 | 0 | |
| 2021 | 81,864 | 81,864 | 0 | |
| 2022 | 38,933 | 5,713 | 33,220 | |
| Total | 140,055 | 106,835 | 33,220 |
Risk Indicators
Combined test, VVB-confirmed
N/A – LFG consumed, no storage
0% deduction, justification contradictory
Project-specific, mixed measured/modelled
FPIC and grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →