Luofan 24MW Hydropower Project In Guizhou Province China
Score Breakdown
Integrity
verified Additionality is confirmed by the VVB using an investment test (validation/verification record).
missing Leakage treatment is missing/unclear (monitoring report shows leakage not addressed and no deduction stated).
Transparency
verified Claimed and verified ERs match at 95,624 tCO2e for the monitoring period (monitoring/verification record).
missing Baseline reassessment timing is not stated in available documents, limiting MRV traceability over time.
Claim Safety
verified The project is explicitly not CORSIA-eligible, reducing aviation-claim channel risk (registry record).
missing Project-specific baseline and missing leakage treatment increase perceived over-crediting/greenwashing risk (PDD/monitoring record).
Documentation
verified Core documents are present (PDD, validation report, monitoring report) with high extraction confidence.
missing Internal inconsistency on safeguards disclosure indicates documentation reliability issues (PDD vs monitoring report).
Detailed Analysis
Integrity
The validation/verification record indicates additionality was assessed via an investment test and confirmed by the VVB, which supports additionality robustness. The baseline is project-specific under ACM0002, but the extracted record does not state when (or if) the baseline was last reassessed, which weakens confidence over a long crediting period. Leakage is a key gap: the monitoring record indicates leakage was not addressed and no leakage deduction is stated, which is a material integrity uncertainty for an avoidance crediting approach.
Transparency
The monitoring period is clearly specified (2011-12-05 to 2013-08-25) and the claimed ERs equal the verified ERs at 95,624 tCO2e in the monitoring/verification record, which is a positive MRV consistency signal. The VVB is identified (China Classification Society Certification Company), supporting audit traceability. However, several MRV-relevant fields are not found in the extracted record (e.g., baseline reassessment timing and some monitoring-method specifics), reducing transparency completeness.
Claim Safety
CORSIA eligibility is explicitly false, which lowers the risk of dual-channel marketing claims tied to CORSIA. At the same time, the baseline is project-specific and leakage is not addressed in the extracted monitoring record, both of which elevate perceived over-crediting risk for external claim-making. CCP status is not stated in available documents, leaving uncertainty about alignment with higher-integrity labels and how claims might be interpreted by buyers.
Documentation
The extracted record includes the key document types (PDD, validation report, monitoring report) and the minimum extraction confidence is high, supporting document completeness and readability. No material findings or corrective actions are reported in the extracted record, which is supportive but depends on the completeness of the underlying reports. A notable weakness is an internal inconsistency on safeguards disclosure between documents, which reduces confidence in the reliability of non-carbon disclosures.
Overall
Overall scoring is pulled up by VVB-confirmed additionality and consistent claimed-versus-verified ERs, but pulled down by missing leakage treatment and missing baseline reassessment information. The contradiction on safeguards is explicitly addressed as follows: the PDD indicates safeguards are mentioned, while the monitoring report indicates safeguards are not mentioned; for scoring, the monitoring report value (more operational/implementation-facing) is privileged, and the inconsistency itself reduces documentation and claim-safety confidence. No gate-rule caps are pre-applied here, but if documentation were to fall below 3.0 it would cap transparency, and if integrity were below 4.0 it would cap overall.
Audit Analysis
This VCS hydropower project reports consistent quantified emission reductions, with the verified and claimed totals matching in the monitoring/verification record. However, key integrity elements are weakly evidenced in the extracted record—especially leakage treatment and baseline reassessment—while safeguards information is inconsistent across documents, increasing reputational and over-crediting risk.
Project Description
The Luofan 24MW Hydropower Project is located in China's Guizhou Province and generates 86,420 MWh of electricity per year. With the ability to displace power from fossil fuel-fired plants, this project is expected to reduce GHG emissions by 56,472tCO2e annually. Additionally, the project doesn't produce any GHG during operation.
Red Flags
- Leakage is not addressed and no leakage deduction is stated in the extracted record, despite ACM0002 projects typically needing an explicit leakage statement.
- Safeguards coverage is contradictory between the PDD and the monitoring report, reducing confidence in social risk management disclosures.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 65,423 | 65,423 | 0 | |
| 2012 | 30,201 | 30,201 | 0 | |
| Total | 95,624 | 95,624 | 0 |
Cosa migliorerebbe questo punteggio
- Provide an explicit leakage assessment consistent with ACM0002 (including a quantified leakage deduction if applicable) in the monitoring/verification documentation.
- Resolve safeguards disclosure inconsistency by publishing a clear safeguards section (FPIC, grievance mechanism, stakeholder engagement outcomes) consistently across the PDD and monitoring reports.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project; reversal risk not material
Leakage not addressed; deduction not stated
Project-specific baseline; reassessment timing unclear
Safeguards disclosure inconsistent across documents
Not CORSIA-eligible; CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →