Mali Safe Drinking Water Program
GS-4364 ↗ · current registry ID: GS12441
#321of 1329 in Industrial#2of 5 in Mali#526of 1801 in Gold Standard (GS)
Audit Analysis
The Mali Safe Drinking Water Program has a solid additionality foundation (combined test, VVB-verified) and no reversal events, but is undermined by a 100× discrepancy in the fNRB value between the verification and monitoring reports, a methodological contradiction on the fNRB source (national default vs. local field), and three material findings including an fNRB calculation error. The project over-delivered relative to its pro-rata expectation (146%), which is reassuring, yet the baseline data inconsistencies create meaningful over- or under-crediting risk.
Red Flags
- fNRB value differs by a factor of 100 between the verification report (60.03) and the monitoring report (0.6003), indicating a probable unit error or calculation mistake that could invalidate the credit quantity
- fNRB method is stated as 'national default' in the verification report but 'local field' in the monitoring report — a fundamental methodological inconsistency
- Three material findings in the verification report, including an fNRB calculation not in line with CDM TOOL30, and five corrective actions still listed as required
- Leakage treatment is contradictory: 5% quantified deduction in the verification report versus 0% / 'deemed negligible' in the validation report
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 124,247 | 0 | 124,247 | |
| 2024 | 124,629 | 0 | 124,629 | |
| Total | 248,876 | 0 | 248,876 |
Risk Indicators
Combined test, VVB-verified
no reversals
5% deduction vs 0% — contradictory
Project-specific; fNRB disputed
FPIC, grievance, benefit sharing
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →