Manejo Sostenible de los Bosques Aplicado en el Oriente Antioqueño bajo el esquema BancO2®
#31of 124 in Colombia#28of 99 in CerCarbono (CC)
Audit Analysis
A jurisdictional-baseline REDD+ project in Antioquia, Colombia with a 14% buffer pool and quantified leakage, but undermined by an extensive list of 18+ verification findings, a confirmed absence of FPIC, deforestation in participant plots, and multiple cross-document contradictions in key emission figures. The project delivered only ~67% of its pro-rata ex-ante expectation for the 2022–2023 period, which is conservative but raises questions about baseline calibration. Documentation quality is further weakened by three rounds of certifier findings and low extraction confidence.
Red Flags
- FPIC was NOT conducted per the verification report (Nov 2024), despite 155 beneficiaries in a rural, poverty-affected community — a significant safeguard gap for a land-use project
- 18+ material findings (SAC, SA, SAF) spanning property-area inconsistencies, socialization failures, legal documentation gaps, and deforestation in participant plots, all requiring corrective action
- Major contradictions in verified ERR figures: 80,512 tCO2e (issuance, 2024) vs 418,946 tCO2e (validation report, 2022) — a 5× discrepancy that undermines data reliability
- Deforestation of 29 ha detected in project area (26 ha non-fire, 3 ha fire), including one participant (552 ha predio) excluded for deforestation
- Three rounds of certifier findings and clarifications (document v5.0, 'tercera ronda') indicate persistent documentation and data-quality issues
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 6,887 | 0 | 6,887 | |
| 2019 | 6,841 | 0 | 6,841 | |
| 2020 | 1,938 | 0 | 1,938 | |
| 2021 | 2,130 | 0 | 2,130 | |
| 2022 | 159 | 0 | 159 | |
| 2023 | 182 | 0 | 182 | |
| Total | 18,137 | 0 | 18,137 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
Quantified with tCO2e values
Jurisdictional, reassessed 2024
Grievance present, FPIC absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.