Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Chile Registry: RegisteredAM0026

Mariposas Hydroelectric Project

VCS-819 ↗

#876of 1935 in Renewable energy#12of 31 in Chile#542of 1339 in Verra (VCS)

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.0
Documentation
4.5

Audit Analysis

The Mariposas Hydroelectric Project is a VCS-registered renewable energy project in Chile with a verified combined additionality test, a jurisdictional baseline reassessed in 2023, and no inherent reversal risk. However, the verification report identified 18 material findings and corrective actions related to calibration gaps, missing ex-ante parameters, and equipment misidentification, which significantly undermine confidence in the MRV chain. The project delivered 21,476 tCO2e for the 2022–2023 monitoring period, below ex-ante estimates due to drier hydrological conditions, which is a conservative outcome.

Red Flags

  • 18 material findings and corrective actions identified in the 2024 verification report, including calibration gaps for energy meters (2018 and 2020), missing ex-ante parameters, and inconsistent equipment identification between the PDD and monitoring reports
  • Contradiction in baseline method: the verification report (2024) states 'jurisdictional' while the monitoring report (2023) states 'project' — the higher-priority verification report is privileged, but the discrepancy raises questions about baseline robustness
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed

Credit Vintages

IssuedRetiredAvailable
2011
9,8999,8981
2012
26,68126,64536
2013
20,28120,2810
2014
19,8807,93411,946
2015
21,740021,740
2016
14,970014,970
2017
14,82048714,333
2018
15,614015,614
2019
14,1961,28912,907
2020
13,98213,9820
2021
8,6418,6410
2022
11,87411,8740
2023
9,6029,6020
Total202,180110,63391,547

Risk Indicators

Additionality

VVB-verified combined test

Permanence

Avoidance project, no reversal risk

Leakage

Deemed negligible, reasonable for grid-replacement hydro

Baseline

Jurisdictional, reassessed 2023

Safeguards

FPIC conducted, grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AM0026

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents