Skip to main content
VCSEnergy industries (renewable/non-renewable sources)Cameroon Registry: RegisteredGeneral Methodologyv2.1

Mbakaou Carriere Small Hydro Power Plant

VCS-3220 ↗

#1273of 1935 in Renewable energy#6of 9 in Cameroon#869of 1339 in Verra (VCS)

4.8/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.0

Audit Analysis

The Mbakaou Carriere small hydro project in Cameroon has a VVB-verified additionality assessment and a reasonable grid emission factor, but is undermined by 16 material findings, 6 outstanding corrective actions, a project-specific baseline, and a significant under-delivery relative to the PDD's lifetime estimate. The low extraction confidence and unresolved contradictions between the PDD and verification report (leakage treatment, benefit sharing, reversal events) reduce confidence in the overall data quality.

Red Flags

  • 16 material findings across validation and verification, including inconsistent ER values, missing stakeholder consultation documentation, and project ownership not assessed
  • 6 corrective actions still required, including demonstrating regulatory surplus and correcting ER values across documents
  • PDD lifetime ERR of 93,709 vs. verified 13,852 for the 3.5-year monitoring period implies only ~30% of pro-rata expectation delivered, raising baseline validity questions
  • Leakage treatment contradicts between PDD ('quantified') and verification report ('deemed negligible') with 0% deduction
  • Low extraction confidence across the document set, with one document of unknown type

Credit Vintages

IssuedRetiredAvailable
2022
3,54003,540
2023
3,71303,713
2024
4,25704,257
2025
2,34202,342
Total13,852013,852

Risk Indicators

Additionality

VVB-verified combined test

Permanence

Hydro generation – no reversal risk

Leakage

0% deduction, PDD/VR contradiction

Baseline

Project-specific, no reassessment date

Safeguards

FPIC, grievance mechanism documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents