ME-SE Solar Power Project
#18of 1935 in Renewable energy#5of 295 in Turkey#6of 1339 in Verra (VCS)#9of 806 in AMS-I.D
Audit Analysis
The ME-SE Solar Power Project is a straightforward renewable energy project in Turkey with a reputable VVB (RINA Services) and a well-documented monitoring record. Additionality is confirmed via an investment test, the baseline uses a jurisdictional grid emission factor, and verified emissions reductions align closely with the pro-rata expectation from the PDD lifetime estimate. The main concerns are numerous inter-document contradictions (particularly on additionality test type, baseline method, and safeguards) and the absence of an explicit non-permanence risk assessment.
Red Flags
- Nine contradictions identified across documents, including additionality test type (investment vs. common practice), baseline method (jurisdictional vs. project), and safeguards/FPIC status — indicating inconsistent documentation over the project lifecycle
- Two corrective actions remain open in the verification report (estimated ER value correction and TEİAŞ data control), suggesting minor data-quality issues in the monitoring record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 2,035 | 0 | 2,035 | |
| 2019 | 10,696 | 0 | 10,696 | |
| 2020 | 10,817 | 0 | 10,817 | |
| 2021 | 10,925 | 0 | 10,925 | |
| 2022 | 10,472 | 0 | 10,472 | |
| 2023 | 10,715 | 0 | 10,715 | |
| 2024 | 1,915 | 0 | 1,915 | |
| Total | 57,575 | 0 | 57,575 |
Risk Indicators
VVB-confirmed investment test
No formal risk rating; low inherent risk
Negligible, justified for grid solar
Jurisdictional EF; doc contradiction noted
FPIC & grievance confirmed but contradicted in earlier docs
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →