Mitti Labs: Supporting Climate Smart Rice Farming Across India
GS-4937 ↗ · current registry ID: GS12793
#58of 108 in Water#577of 975 in India#859of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard PoA project for methane reduction in Indian rice cultivation is at the validation stage with a VVB-confirmed combined additionality test and a measured project-specific baseline. However, leakage treatment is entirely absent, no buffer pool is specified, and 19 corrective actions plus multiple forward-looking requirements remain open, indicating the project's design is not yet fully robust. The lack of any monitoring data, combined with the PoA structure requiring per-VPA validation, means the integrity of future credit claims remains untested.
Red Flags
- No leakage deduction or justification is stated anywhere in the available documents, despite rice water-management changes potentially shifting methane emissions to adjacent fields or altering downstream hydrology.
- 19 corrective actions and multiple forward-looking requirements (FARs) remain open in the validation report, including missing double-counting prevention steps, undefined project boundary, and absent additionality justification at the PoA level.
- The PDD (2023) and validation report (2026) contradict each other on the additionality test type, grievance mechanism presence, and whether the baseline is measured or modeled, indicating the project design has shifted significantly between submissions.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 11,484 | 10,850 | 634 | |
| Total | 11,484 | 10,850 | 634 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
No deduction or justification stated
Project-specific, measured, reassessment timing not stated
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →