MIVO Energie - Enabling LPG access for cooking in Togo
GS-2670 ↗ · current registry ID: GS10712
#791of 1329 in Industrial#4of 15 in Togo#1181of 1801 in Gold Standard (GS)
Audit Analysis
The MIVO Energie LPG cooking project in Togo has a VVB-confirmed additionality assessment and a consistent verified-to-claimed ERR ratio, but is significantly under-delivering (approximately 51% of the pro-rata ex-ante expectation) due to stove distribution falling well short of projections. The MRV system exhibits serious data-quality weaknesses including traceability failures, duplicate records, and a post-certification correction to the charcoal emission factor. Extensive corrective actions remain open, and the project-specific baseline combined with the absence of a stated buffer pool leaves permanence and baseline robustness as ongoing concerns.
Red Flags
- Stove distribution (15,541 units) is only 34% of the initially projected 45,500, driving verified ERR to roughly 51% of the pro-rata ex-ante expectation for the elapsed monitoring period.
- Non-traceable LPG units were included in emission reduction calculations, violating double-counting prevention requirements (CAR #5 in the verification report).
- The charcoal emission factor in the ER calculation sheet was corrected only after certification, indicating a post-hoc adjustment to a baseline parameter.
- FPIC status is contradictory: the PDD (2023) records FPIC as conducted, while the verification report (2026) records it as not conducted.
- No buffer pool percentage or permanence mechanism is stated in any available document, leaving reversal risk unaddressed for a 5-year crediting period.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 7,357 | 7,357 | 0 | |
| 2021 | 31,174 | 31,174 | 0 | |
| 2022 | 42,643 | 1,548 | 41,095 | |
| 2023 | 54,935 | 0 | 54,935 | |
| 2024 | 61,438 | 0 | 61,438 | |
| Total | 197,547 | 40,079 | 157,468 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction; justification inconsistent across documents
Project-specific; KPT added post-inception; under-delivery vs ex-ante
Grievance mechanism present; FPIC status contradictory
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →