MIVO Energie - Enabling LPG access for cooking in Togo

GS-2670 ↗ · current registry ID: GS10712

#791of 1329 in Industrial#4of 15 in Togo#1181of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
5.0
Documentation
5.0

Audit Analysis

The MIVO Energie LPG cooking project in Togo has a VVB-confirmed additionality assessment and a consistent verified-to-claimed ERR ratio, but is significantly under-delivering (approximately 51% of the pro-rata ex-ante expectation) due to stove distribution falling well short of projections. The MRV system exhibits serious data-quality weaknesses including traceability failures, duplicate records, and a post-certification correction to the charcoal emission factor. Extensive corrective actions remain open, and the project-specific baseline combined with the absence of a stated buffer pool leaves permanence and baseline robustness as ongoing concerns.

Red Flags

  • Stove distribution (15,541 units) is only 34% of the initially projected 45,500, driving verified ERR to roughly 51% of the pro-rata ex-ante expectation for the elapsed monitoring period.
  • Non-traceable LPG units were included in emission reduction calculations, violating double-counting prevention requirements (CAR #5 in the verification report).
  • The charcoal emission factor in the ER calculation sheet was corrected only after certification, indicating a post-hoc adjustment to a baseline parameter.
  • FPIC status is contradictory: the PDD (2023) records FPIC as conducted, while the verification report (2026) records it as not conducted.
  • No buffer pool percentage or permanence mechanism is stated in any available document, leaving reversal risk unaddressed for a 5-year crediting period.

Credit Vintages

IssuedRetiredAvailable
2020
7,3577,3570
2021
31,17431,1740
2022
42,6431,54841,095
2023
54,935054,935
2024
61,438061,438
Total197,54740,079157,468

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction; justification inconsistent across documents

Baseline

Project-specific; KPT added post-inception; under-delivery vs ex-ante

Safeguards

Grievance mechanism present; FPIC status contradictory

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents